Food-plant heat recovery: first site-record checklist Use this to identify missing measurements and next steps, not to select equipment. Mark unknowns as “to measure”; do not present defaults as site data. 1. Record scope Record date, production shift, system boundary, measurement locations, sources and methods. Distinguish measurements, plant-supplied information and assumptions. Record / source / missing measurements: ____________________ 2. Heat source Record fluid, supply/return temperatures (°C), flow with units, recovery location and variation. Note whether heat extraction affects the existing refrigeration system. Record / source / missing measurements: ____________________ 3. Heat demand Record required supply/return temperatures (°C), water demand or heat duty with units, and timing. Separate cleaning, process and other uses. Record / source / missing measurements: ____________________ 4. Operating overlap Record source and demand loads on the same time axis, covering shifts, cleaning and downtime. A single reading cannot represent long-term variation. Record / source / missing measurements: ____________________ 5. Existing energy use Record existing heating fuel or electricity use, measurement period and energy prices. Account separately for pumps, fans, changes in refrigeration power and other auxiliaries. Record / source / missing measurements: ____________________ 6. Constraints & gaps Record hygienic separation, space, maintenance, shutdown windows and safety matters requiring specialist review. Assign responsibility for each missing measurement. Record / source / missing measurements: ____________________ Next: resolve missing inputs before project screening. Qualified professionals must review ammonia safety, pressure equipment and hygienic design. Material version: 2026-10-14. Refer to each case’s cited sources and dates for its status and figures. https://www.openthermalai.com/en/media.html#checklist