Engineering services · Annex 58 Task 3

Applications & transition

Aligned with Annex 58 Task 3 — Applications and transition: strategies that help end-users move from fossil process heat toward heat-pump-based supply. The service is a phased transition roadmap, not a single-skid sales pitch.

Services

Annex 58 Task 3 lens

Task 3 supports conversion strategies—where HTHPs fit in a site decarbonisation path and in which order.

BaseRankPilotScaleAnnex 58 Task 3 · Transition
Task 3 idea: baseline → priority processes → pilots → scale. Orientation schematic.

End-user guidance

Guidelines help owners structure decisions: which processes first, what data to collect, how to stage investment.

Beyond one machine

Transition mixes technology (Task 1), integration (Task 2), and organisation—procurement, metering, and skills.

Official reading

Task 3 report via Project 58. Site guide: Annex 58 Task guide.

Roadmap logic we apply

Turn Annex 58 strategy language into a dated plan for your plant.

Heat-demand segmentation

Split <100 °C, 100–150 °C, 150–200 °C bands; match to technology readiness from Task 1.

Pilot then scale

Pick one measurable node, prove duty points, then replicate—avoid enterprise-wide guesses.

Advisory deliverables

Board-readable roadmap with engineering guts.

Outputs

Priority matrix, 3–5 year phases, data gaps, and links to Task 4 specification work for the first pilot.

Transition checklist

  • Site heat & fuel baseline
  • Process list ranked by temperature / hours / CO₂
  • Pilot node with success metrics
  • Organisation owners (energy / process / capex)
  • Policy / incentive scan (non-legal)
  • Link to Task 2 concept and Task 4 specs

Other duties

Building electrification roadmaps exist, but Annex 58 Task 3 is written for industrial process heat conversion.

Quick FAQs

Is this a carbon audit?

It can use audit data, but the product is a heat-pump transition sequence—not a full GHG inventory.

What if fossil boilers must stay?

Roadmaps often keep peaking / backup boilers—say so explicitly (Task 3 realism).

Independent advisory. Annex 58 materials remain © their authors / HPT TCP. Not a substitute for codes, OEM manuals, or legal counsel.