Engineering services · Annex 58 Task 2

Integration concepts

Aligned with Annex 58 Task 2 — Integration concepts: best-practice ways to couple heat pumps to process heat sinks (steam, hot water, drying, etc.). The service turns those concepts into site-specific integration sketches and battery limits.

Services

Annex 58 Task 2 lens

Task 2 develops best-practice integration concepts for promising industrial applications—not generic “put a heat pump somewhere”.

ProcessCouplingHTHPAnnex 58 Task 2 · Integration
Task 2 idea: process unit ↔ thermal coupling ↔ HTHP skid. Not a P&ID—orientation only.

Application cases

Steam generation, hot-water loops, and sector examples (e.g. drying) need different coupling templates. We start from process duty, then pick a pattern.

Beyond the box

Annex 58 stresses process integration: reboilers, dryers, and heat cascades matter as much as unit COP.

Official reading

See Task 2 report on Project 58. Site guide: Annex 58 Task guide.

Integration patterns we use

Translate Task 2 ideas into drawable battery limits for your plant.

Direct sink vs intermediate loop

Choose direct process coupling or a buffer / intermediate circuit based on fouling, pressure, and control ownership.

Heat cascade & surplus heat

Map available sources against sinks before sizing compressors—Task 2 logic in plant language.

Advisory deliverables

Concept package ready for EPC / OEM dialogue.

Outputs

Block-flow + battery-limit sketch, interface list, instrumentation gaps, and risks that kill the concept.

Integration checklist

  • Process P&ID snippets for candidate nodes
  • Source and sink simultaneous availability
  • Chosen coupling pattern with rejected alternatives
  • OEM vs site scope (battery limits)
  • Control / safety ownership
  • Next gate: survey measurements or Task 3 roadmap

Other duties

Building HVAC integration is thinner (hydronic headers, defrost). Annex 58 Task 2 depth stays on industrial process coupling.

Quick FAQs

Do you replace the EPC?

No. We frame concepts and interfaces; EPC owns detailed design and construction.

How early should Task 2 thinking start?

Before OEM quotes—quotes without a coupling story become change-order machines.

Independent advisory. Annex 58 materials remain © their authors / HPT TCP. Not a substitute for codes, OEM manuals, or legal counsel.