HEINEKEN Manchester: heat recovery for a brewery hot-water network

New operating disclosure in September 2026; commissioned in June 2025. Public-source reference, not independently metered by this site.

Engineering data

Case type
Public-source case — figures from published reports, papers, or vendor materials
Data status
Public-source case
Reviewer / date
Editorial (Open Thermal AI) · 2026-11-02
Industry
Food
Source temperature
Not disclosed
Sink temperature
90°C
Temperature lift
Not applicable
Heating or cooling duty
Not disclosed
Architecture
Ammonia heat pumps with heat-recovery and distribution pipework.
Result status
Owner reports 33% less on-site gas and 42% lower CO₂ intensity (kg CO₂/hl), July–December 2025 versus July–December 2024.
Key risk
42% is emissions intensity, not energy savings. Six-month comparison; 90°C is a design value. COP and annual hours undisclosed.
Existing system
Gas-fired steam boilers serving brewing and packaging.
Refrigerant
R717
COP
Not disclosed
Annual energy / emissions savings
See the six-month comparison in result status; no annual cost saving calculated here.
Estimated payback
Not disclosed in the sources reviewed.

Project background

This retrofit illustrates changing the heat-distribution temperature as part of electrification.

Narrative inputs

The 90°C figure and ammonia refrigerant come from GEA’s 2023 design announcement, not a published operating temperature log.

Heat pump solution

Recovered heat feeds the new water network; existing process equipment also required modification.

COP & savings

The owner’s 9 September 2026 release reports post-commissioning results while optimisation continues. The original 45% gas-saving forecast is not substituted for the reported result.

Investment / ROI notes

The owner reports £28.2 million investment, including £3.7 million public support. Payback and net annual energy cost are undisclosed.

FAQ

What should I check at my own site?

Record source and demand temperatures, simultaneous loads, backup duty and electricity use across the full system. Recalculate costs with local tariffs; this reference is not a performance guarantee.