Field preparation
Hot-water demand and waste-heat preparation
Choose one device or process and record each item. Leave unknowns blank; guidance and sources continue below.
Enable JavaScript for electronic entry. The blank checklist below can still be printed using your browser; the guide remains available.
Print blank sheet
Open Thermal AI · Blank sheet
Hot-water demand and waste-heat preparation
Sheet ID: ________________ · Template version: 2026-10-18.1
- Site / workshop
- Equipment tag / process
- Recorded by
- Survey date
This sheet collects evidence. Recorded does not mean verified or feasible; unknown values stay blank.
Recorded does not mean verified. Completion does not establish safety, feasibility or savings; professional review is still needed.
| HW-01 · Identify the hot-water user · ________ | |
|---|---|
| Equipment tag, process/cleaning/domestic purpose. Where to look; what to do if missing: Use process or cleaning procedures; do not assume hygiene requirements. An equipment tag is the identifier on its label or drawing. If unavailable, record the name and location and mark the tag as unconfirmed; do not invent an official identifier. | |
| Water-use purpose | |
| Process/cleaning procedure ID | |
| Record status | □ Not reviewed □ Recorded □ Needs measurement □ Needs confirmation □ Not applicable (explain) |
| Evidence type | |
| Document ID / source reference | |
| Measurement point / object location | |
| Time or recording period | |
| Operating condition (production/cleaning/idle) | |
| Notes / related sheet ID | |
| Action owner | |
| Target date | |
| Reason not applicable | |
| Reviewer, date and comments (human review) | |
| HW-02 · Confirm the process requirement · ________ | |
|---|---|
| Required temperature, tolerance, batch/continuous operation and reviewer. Where to look; what to do if missing: Use approved process documents; mark unconfirmed requirements for review. | |
| Required process temperature (°C) | |
| Allowed variation (°C) | |
| Batch or continuous operation | |
| Process reviewer | |
| Record status | □ Not reviewed □ Recorded □ Needs measurement □ Needs confirmation □ Not applicable (explain) |
| Evidence type | |
| Document ID / source reference | |
| Measurement point / object location | |
| Time or recording period | |
| Operating condition (production/cleaning/idle) | |
| Notes / related sheet ID | |
| Action owner | |
| Target date | |
| Reason not applicable | |
| Reviewer, date and comments (human review) | |
| HW-03 · Record actual inlet and supply temperatures · ________ | |
|---|---|
| Cold inlet and hot supply temperatures, points and times. Where to look; what to do if missing: Use existing instruments or trends; distinguish actual readings from setpoints. | |
| Actual inlet temperature (°C) | |
| Actual supply temperature (°C) | |
| Record status | □ Not reviewed □ Recorded □ Needs measurement □ Needs confirmation □ Not applicable (explain) |
| Evidence type | |
| Document ID / source reference | |
| Measurement point / object location | |
| Time or recording period | |
| Operating condition (production/cleaning/idle) | |
| Notes / related sheet ID | |
| Action owner | |
| Target date | |
| Reason not applicable | |
| Reviewer, date and comments (human review) | |
| HW-04 · Check actual water consumption · ________ | |
|---|---|
| Flow or volume per batch, duration and frequency. Where to look; what to do if missing: Use meters and production logs; circulation flow is not necessarily new hot-water demand. | |
| Actual volume or flow and unit | |
| Duration and frequency | |
| Water meter ID | |
| Record status | □ Not reviewed □ Recorded □ Needs measurement □ Needs confirmation □ Not applicable (explain) |
| Evidence type | |
| Document ID / source reference | |
| Measurement point / object location | |
| Time or recording period | |
| Operating condition (production/cleaning/idle) | |
| Notes / related sheet ID | |
| Action owner | |
| Target date | |
| Reason not applicable | |
| Reviewer, date and comments (human review) | |
| HW-05 · Record existing heat supply · ________ | |
|---|---|
| Steam, electricity or other heat; same-period energy, scope and tariff. Where to look; what to do if missing: Use submeters and bills; mark unallocated use as unknown. | |
| Current heating method | |
| Same-period energy and unit | |
| Tariff and metering scope | |
| Record status | □ Not reviewed □ Recorded □ Needs measurement □ Needs confirmation □ Not applicable (explain) |
| Evidence type | |
| Document ID / source reference | |
| Measurement point / object location | |
| Time or recording period | |
| Operating condition (production/cleaning/idle) | |
| Notes / related sheet ID | |
| Action owner | |
| Target date | |
| Reason not applicable | |
| Reviewer, date and comments (human review) | |
| HW-06 · Record a candidate waste-heat stream · ________ | |
|---|---|
| Fluid, temperature, flow and units, existing use. Where to look; what to do if missing: Use diagrams and trends; keep separate heat streams separate. | |
| Waste-heat fluid and current use | |
| Source temperature (°C) | |
| Actual flow and unit | |
| Record status | □ Not reviewed □ Recorded □ Needs measurement □ Needs confirmation □ Not applicable (explain) |
| Evidence type | |
| Document ID / source reference | |
| Measurement point / object location | |
| Time or recording period | |
| Operating condition (production/cleaning/idle) | |
| Notes / related sheet ID | |
| Action owner | |
| Target date | |
| Reason not applicable | |
| Reviewer, date and comments (human review) | |
| HW-07 · Align source and water-use times · ________ | |
|---|---|
| Same-date operating intervals and seasonal changes. Where to look; what to do if missing: Compare simultaneous trends and shift logs; schedule collection if they are missing. Overlap hours are the times when source heat is available and the process needs heat simultaneously. Compare both operating logs. Do not assume 8,760 hours or use only one side’s running hours. Storage for mismatched timing needs separate assessment. | |
| Source dates and hours | |
| Demand dates and hours | |
| Seasonal changes | |
| Record status | □ Not reviewed □ Recorded □ Needs measurement □ Needs confirmation □ Not applicable (explain) |
| Evidence type | |
| Document ID / source reference | |
| Measurement point / object location | |
| Time or recording period | |
| Operating condition (production/cleaning/idle) | |
| Notes / related sheet ID | |
| Action owner | |
| Target date | |
| Reason not applicable | |
| Reviewer, date and comments (human review) | |
| HW-08 · Check fluid separation and layout · ________ | |
|---|---|
| Isolation requirements, reviewer, distance, existing tanks and space. Where to look; what to do if missing: Use process documents and a site sketch; do not assume source fluid can contact cleaning water. | |
| Separation requirements and reviewer | |
| Distance and space | |
| Existing storage tanks | |
| Record status | □ Not reviewed □ Recorded □ Needs measurement □ Needs confirmation □ Not applicable (explain) |
| Evidence type | |
| Document ID / source reference | |
| Measurement point / object location | |
| Time or recording period | |
| Operating condition (production/cleaning/idle) | |
| Notes / related sheet ID | |
| Action owner | |
| Target date | |
| Reason not applicable | |
| Reviewer, date and comments (human review) | |
Four checks before a project
Having both waste heat and a hot-water demand does not establish a workable project. Check usable temperature, available heat duty, simultaneous demand and the separation required between fluids. If one is unknown, identify the measurement before selecting equipment.
Put both sides on one time axis
Record source and hot-water temperatures, flow with units, production shifts, cleaning and downtime over representative operation. Heat available at night cannot automatically serve daytime demand. Storage would require a separate assessment of capacity, losses, hygiene, space and cost.
A potential recovery stream may already serve another process. Do not allocate the same heat to two uses.
Understand the route
Where source conditions can meet the required temperature through a suitable heat exchanger, examine direct recovery. Where temperature upgrading is needed, assess a heat pump against the same useful demand. Include effects on the original refrigeration system, pumps, backup supply and integration. Useful recovered heat is not the same as net savings.
Use a blank checklist
Use the site measurement checklist, then compare the recovery routes and their boundaries. The anonymized food-plant reference illustrates an arrangement; plant-reported economics are not independently metered savings or a guarantee for your site.
Sources and limits
This is an editorial learning guide, not a plant audit or a measured savings result. Site inputs remain unknown until supplied and checked. Detailed design, procurement, hygienic and pressure-equipment decisions require qualified review. Read our editorial principles.
现场准备单
热水需求与余热准备单
选定一台设备或一道工序,按项记录。未掌握的数据留空,资料和原理在下方继续阅读。
电子填写需要启用 JavaScript。以下空白单仍可通过浏览器打印,原指南继续保留。
打印空白单
Open Thermal AI · 空白准备单
热水需求与余热准备单
准备单编号: ________________ · 模板版本: 2026-10-18.1
- 工厂/车间
- 设备名称或编号 / 工序名称
- 记录人
- 调查日期
本单用于收集资料。已记录不等于已核实,也不代表项目可行;未知值留空。
已记录不等于已核实。填写完成不代表安全合格、项目可行或节能收益;专业人员仍需复核。
| HW-01 · 选定用水设备并说明用途 · ________ | |
|---|---|
| 设备位号;清洗/工艺/生活等用途 去哪里查;缺失时怎么办: 生产或清洗规程;用途未确认时不要自行确定卫生条件 设备编号(位号)通常在现场标签或图纸上。没有编号时先写设备名称和位置,并注明编号待确认,不必编造正式编号。 | |
| 用水用途 | |
| 工艺或清洗规程编号 | |
| 记录状态 | □ 未查看 □ 已记录 □ 待补测 □ 待确认 □ 不适用(须说明) |
| 资料类型 | |
| 资料编号/来源说明 | |
| 测点/对象位置 | |
| 记录时间或起止周期 | |
| 运行状态(生产/清洗/待机等) | |
| 备注/关联准备单编号 | |
| 待办负责人 | |
| 约定完成日期 | |
| 不适用的原因 | |
| 复核人、日期与意见(由人填写) | |
| HW-02 · 查工艺要求 · ________ | |
|---|---|
| 要求温度 °C、允许波动、批次或连续运行、确认人 去哪里查;缺失时怎么办: 工艺文件;要求值未确认列为待确认 | |
| 工艺要求温度 (°C) | |
| 允许波动 (°C) | |
| 批次或连续方式 | |
| 工艺确认人 | |
| 记录状态 | □ 未查看 □ 已记录 □ 待补测 □ 待确认 □ 不适用(须说明) |
| 资料类型 | |
| 资料编号/来源说明 | |
| 测点/对象位置 | |
| 记录时间或起止周期 | |
| 运行状态(生产/清洗/待机等) | |
| 备注/关联准备单编号 | |
| 待办负责人 | |
| 约定完成日期 | |
| 不适用的原因 | |
| 复核人、日期与意见(由人填写) | |
| HW-03 · 记录实际冷水与热水工况 · ________ | |
|---|---|
| 进水温度、实际供水温度 °C、测点与时间 去哪里查;缺失时怎么办: 现有仪表/趋势;设定值与实际值分开 | |
| 实际进水温度 (°C) | |
| 实际供水温度 (°C) | |
| 记录状态 | □ 未查看 □ 已记录 □ 待补测 □ 待确认 □ 不适用(须说明) |
| 资料类型 | |
| 资料编号/来源说明 | |
| 测点/对象位置 | |
| 记录时间或起止周期 | |
| 运行状态(生产/清洗/待机等) | |
| 备注/关联准备单编号 | |
| 待办负责人 | |
| 约定完成日期 | |
| 不适用的原因 | |
| 复核人、日期与意见(由人填写) | |
| HW-04 · 核对实际用水量 · ________ | |
|---|---|
| m³/h 或每批 m³、持续时间、用水频次 去哪里查;缺失时怎么办: 水表/生产记录;循环流量不能直接当新增加热水量 | |
| 实际水量或流量及单位 | |
| 每次持续时间和频次 | |
| 水表编号 | |
| 记录状态 | □ 未查看 □ 已记录 □ 待补测 □ 待确认 □ 不适用(须说明) |
| 资料类型 | |
| 资料编号/来源说明 | |
| 测点/对象位置 | |
| 记录时间或起止周期 | |
| 运行状态(生产/清洗/待机等) | |
| 备注/关联准备单编号 | |
| 待办负责人 | |
| 约定完成日期 | |
| 不适用的原因 | |
| 复核人、日期与意见(由人填写) | |
| HW-05 · 列出现有加热方式 · ________ | |
|---|---|
| 蒸汽/电/其他;同周期用能、计量范围、价格 去哪里查;缺失时怎么办: 分表及账单;无法分离则标注,保留未知 | |
| 现有加热方式 | |
| 同周期用能及单位 | |
| 单价和计量范围 | |
| 记录状态 | □ 未查看 □ 已记录 □ 待补测 □ 待确认 □ 不适用(须说明) |
| 资料类型 | |
| 资料编号/来源说明 | |
| 测点/对象位置 | |
| 记录时间或起止周期 | |
| 运行状态(生产/清洗/待机等) | |
| 备注/关联准备单编号 | |
| 待办负责人 | |
| 约定完成日期 | |
| 不适用的原因 | |
| 复核人、日期与意见(由人填写) | |
| HW-06 · 记录候选余热 · ________ | |
|---|---|
| 介质、可接近测点、温度 °C、流量及单位、现有用途 去哪里查;缺失时怎么办: 图纸、现有运行记录;分别记录各股热源,不直接相加 | |
| 余热介质和现有用途 | |
| 余热温度 (°C) | |
| 实际流量及单位 | |
| 记录状态 | □ 未查看 □ 已记录 □ 待补测 □ 待确认 □ 不适用(须说明) |
| 资料类型 | |
| 资料编号/来源说明 | |
| 测点/对象位置 | |
| 记录时间或起止周期 | |
| 运行状态(生产/清洗/待机等) | |
| 备注/关联准备单编号 | |
| 待办负责人 | |
| 约定完成日期 | |
| 不适用的原因 | |
| 复核人、日期与意见(由人填写) | |
| HW-07 · 对齐热源和用水时间 · ________ | |
|---|---|
| 同一日期内的运行区间;季节变化 去哪里查;缺失时怎么办: 同期趋势与班次记录;没有同时段数据就形成记录任务 同时运行时间是余热可用、工序又需要热的共同时间。对照两侧运行记录逐段核对;不能直接填全年 8760 小时,也不能只用一侧的开机小时。储热能否弥补错峰须另行核实。 | |
| 热源运行日期和时段 | |
| 用热运行日期和时段 | |
| 季节变化 | |
| 记录状态 | □ 未查看 □ 已记录 □ 待补测 □ 待确认 □ 不适用(须说明) |
| 资料类型 | |
| 资料编号/来源说明 | |
| 测点/对象位置 | |
| 记录时间或起止周期 | |
| 运行状态(生产/清洗/待机等) | |
| 备注/关联准备单编号 | |
| 待办负责人 | |
| 约定完成日期 | |
| 不适用的原因 | |
| 复核人、日期与意见(由人填写) | |
| HW-08 · 查介质隔离与布置条件 · ________ | |
|---|---|
| 隔离要求确认人、间距、已有储罐及可用空间 去哪里查;缺失时怎么办: 工艺文件、现场简图;不能默认余热介质可接触清洗水 | |
| 隔离要求和确认人 | |
| 距离和空间 | |
| 已有储罐情况 | |
| 记录状态 | □ 未查看 □ 已记录 □ 待补测 □ 待确认 □ 不适用(须说明) |
| 资料类型 | |
| 资料编号/来源说明 | |
| 测点/对象位置 | |
| 记录时间或起止周期 | |
| 运行状态(生产/清洗/待机等) | |
| 备注/关联准备单编号 | |
| 待办负责人 | |
| 约定完成日期 | |
| 不适用的原因 | |
| 复核人、日期与意见(由人填写) | |
先核对四件事
同时有余热和热水需求,并不能证明项目可行。要核对有效温度、可用热量、同时用热和介质隔离要求;其中一项未知时,先明确补测任务,再考虑设备。
将热源与用热放在同一时间轴
在代表性运行周期内记录热源与热水的温度、带单位的流量,以及班次、清洗和停机时间。夜间存在的热量不能自动满足白天需求;储热需要另行评估容量、损失、卫生、场地和成本。
潜在回收热量可能已经用于其他工序,同一份热量不能重复分配。
了解可能的路线
若热源通过合适的换热器就能满足需求温度,先研究直接利用。需要升温时,再在相同有效用热边界下评估热泵。计入原制冷系统影响、泵、备用供热和集成条件;回收热量不等于净节能。
从空白清单开始
依据与使用边界
本文为编辑整理的入门指南,不是现场审计或实测节能成果。现场数据在提供并核对前保持未知。详细设计、采购、卫生与压力设备事项需要合格专业人员复核。参见编辑原则。