現場準備單
蒸汽用量與費用準備單
選定一臺設備或一道工序,按項記錄。未掌握的數據留空,資料和原理在下方繼續閱讀。
電子填寫需要啓用 JavaScript。以下空白單仍可通過瀏覽器打印,原指南繼續保留。
打印空白單
Open Thermal AI · Blank sheet
蒸汽用量與費用準備單
Sheet ID: ________________ · Template version: 2026-10-18.1
- 工廠/車間
- 設備名稱或編號 / 工序名稱
- 記錄人
- 調查日期
本單用於收集資料。已記錄不等於已覈實,也不代表項目可行;未知值留空。
已記錄不等於已覈實。填寫完成不代表安全合格、項目可行或節能收益;專業人員仍需複覈。
| ST-01 · Identify the steam user · ________ | |
|---|---|
| 車間、設備位號、用途、供汽來源 Where to look; what to do if missing: Read equipment labels and the piping diagram; sketch unknown connections. 設備編號(位號)通常在現場標籤或圖紙上。沒有編號時先寫設備名稱和位置,並註明編號待確認,不必編造正式編號。 | |
| 用途 | |
| 供汽來源 | |
| 記錄狀態 | □ Not reviewed □ Recorded □ Needs measurement □ Needs confirmation □ Not applicable (explain) |
| 資料類型 | |
| 資料編號/來源說明 | |
| 測點/對象位置 | |
| 記錄時間或起止週期 | |
| 運行狀態(生產/清洗/待機等) | |
| 備註/關聯準備單編號 | |
| 待辦負責人 | |
| 約定完成日期 | |
| 不適用的原因 | |
| 複覈人、日期與意見(由人填寫) | |
| ST-02 · Read the bill and identify its coverage · ________ | |
|---|---|
| 賬期、用量、單位、單價、計價口徑、覆蓋設備 Where to look; what to do if missing: Use bills and supply contracts; mark whole-plant bills as unallocated. 計價方式是賬單按什麼數量收費,例如元/噸蒸汽、元/kWh 電。覈對幣種、單位、賬期、含稅情況及固定費用;全廠賬單不能未經分攤就用於一臺設備。 | |
| 賬期 | |
| 賬單用量及單位 | |
| 單價及計價口徑 | |
| 覆蓋哪些設備 | |
| 記錄狀態 | □ Not reviewed □ Recorded □ Needs measurement □ Needs confirmation □ Not applicable (explain) |
| 資料類型 | |
| 資料編號/來源說明 | |
| 測點/對象位置 | |
| 記錄時間或起止週期 | |
| 運行狀態(生產/清洗/待機等) | |
| 備註/關聯準備單編號 | |
| 待辦負責人 | |
| 約定完成日期 | |
| 不適用的原因 | |
| 複覈人、日期與意見(由人填寫) | |
| ST-03 · Record inlet steam conditions · ________ | |
|---|---|
| Pressure with gauge/absolute basis, temperature and measurement time. Where to look; what to do if missing: Use existing instruments and logs; have an engineer confirm an unknown steam state. 表壓以當地大氣壓力爲零點,絕壓以真空爲零點。先查儀表或文件標註;不知道基準時保留原讀數和單位,標記待確認,不自動換算。 | |
| 入口壓力及單位 | |
| 壓力基準(表壓/絕壓) | |
| Inlet temperature (°C) | |
| 記錄狀態 | □ Not reviewed □ Recorded □ Needs measurement □ Needs confirmation □ Not applicable (explain) |
| 資料類型 | |
| 資料編號/來源說明 | |
| 測點/對象位置 | |
| 記錄時間或起止週期 | |
| 運行狀態(生產/清洗/待機等) | |
| 備註/關聯準備單編號 | |
| 待辦負責人 | |
| 約定完成日期 | |
| 不適用的原因 | |
| 複覈人、日期與意見(由人填寫) | |
| ST-04 · Find equipment steam-use records · ________ | |
|---|---|
| 同期累計量 t 或流量 t/h、起止時間、表號 Where to look; what to do if missing: Use submeter history; record a metering gap instead of using rated boiler output. | |
| 累計用汽量或流量及單位 | |
| 計量起止時間 | |
| 表號 | |
| 記錄狀態 | □ Not reviewed □ Recorded □ Needs measurement □ Needs confirmation □ Not applicable (explain) |
| 資料類型 | |
| 資料編號/來源說明 | |
| 測點/對象位置 | |
| 記錄時間或起止週期 | |
| 運行狀態(生產/清洗/待機等) | |
| 備註/關聯準備單編號 | |
| 待辦負責人 | |
| 約定完成日期 | |
| 不適用的原因 | |
| 複覈人、日期與意見(由人填寫) | |
| ST-05 · Trace condensate return · ________ | |
|---|---|
| Return, discharge or other use; known temperature and quantity. Where to look; what to do if missing: Check diagrams and recovery logs; ask site personnel to confirm unknown connections. | |
| Condensate destination | |
| Return temperature (°C) | |
| 回水量及計量週期 | |
| 記錄狀態 | □ Not reviewed □ Recorded □ Needs measurement □ Needs confirmation □ Not applicable (explain) |
| 資料類型 | |
| 資料編號/來源說明 | |
| 測點/對象位置 | |
| 記錄時間或起止週期 | |
| 運行狀態(生產/清洗/待機等) | |
| 備註/關聯準備單編號 | |
| 待辦負責人 | |
| 約定完成日期 | |
| 不適用的原因 | |
| 複覈人、日期與意見(由人填寫) | |
| ST-06 · Align production and supply schedules · ________ | |
|---|---|
| 班次、生產/清洗/停機時段、同期產量 Where to look; what to do if missing: Use shift logs; state which conditions the selected period represents. Overlap hours are the times when source heat is available and the process needs heat simultaneously. Compare both operating logs. Do not assume 8,760 hours or use only one side’s running hours. Storage for mismatched timing needs separate assessment. | |
| 生產/清洗/停機時段 | |
| 同期產量及單位 | |
| 代表哪些工況 | |
| 記錄狀態 | □ Not reviewed □ Recorded □ Needs measurement □ Needs confirmation □ Not applicable (explain) |
| 資料類型 | |
| 資料編號/來源說明 | |
| 測點/對象位置 | |
| 記錄時間或起止週期 | |
| 運行狀態(生產/清洗/待機等) | |
| 備註/關聯準備單編號 | |
| 待辦負責人 | |
| 約定完成日期 | |
| 不適用的原因 | |
| 複覈人、日期與意見(由人填寫) | |
| ST-07 · Check maintenance records · ________ | |
|---|---|
| 保溫、泄漏、疏水器的最近檢查日期與未關閉事項 Where to look; what to do if missing: Use maintenance records; request a professional check without touching hot pipes or adjusting valves. | |
| 最近檢查日期 | |
| 未處理事項 | |
| 記錄狀態 | □ Not reviewed □ Recorded □ Needs measurement □ Needs confirmation □ Not applicable (explain) |
| 資料類型 | |
| 資料編號/來源說明 | |
| 測點/對象位置 | |
| 記錄時間或起止週期 | |
| 運行狀態(生產/清洗/待機等) | |
| 備註/關聯準備單編號 | |
| 待辦負責人 | |
| 約定完成日期 | |
| 不適用的原因 | |
| 複覈人、日期與意見(由人填寫) | |
| ST-08 · Identify potential waste heat · ________ | |
|---|---|
| 來源位置、介質、已知溫度/流量/時段、是否已利用 Where to look; what to do if missing: Use diagrams and operating data. Steam records may be collected before a heat source is identified. Overlap hours are the times when source heat is available and the process needs heat simultaneously. Compare both operating logs. Do not assume 8,760 hours or use only one side’s running hours. Storage for mismatched timing needs separate assessment. | |
| 熱源位置和介質 | |
| 已知溫度/流量及單位 | |
| 可用時段和已有用途 | |
| 記錄狀態 | □ Not reviewed □ Recorded □ Needs measurement □ Needs confirmation □ Not applicable (explain) |
| 資料類型 | |
| 資料編號/來源說明 | |
| 測點/對象位置 | |
| 記錄時間或起止週期 | |
| 運行狀態(生產/清洗/待機等) | |
| 備註/關聯準備單編號 | |
| 待辦負責人 | |
| 約定完成日期 | |
| 不適用的原因 | |
| 複覈人、日期與意見(由人填寫) | |
先選一個具體用熱任務
Choose a production line, cleaning-water loop or drying task. Record what it needs and which existing supply serves it. A whole-site fuel bill may cover several uses; it cannot establish the recoverable heat or replacement share for one project.
先準備這幾類資料
- Supply: own boiler or purchased steam; fuel or contract price, units and billing period.
- Demand: end use, required temperature, steam state where relevant, and load or consumption records.
- Timing: production, cleaning, shutdown and seasonal schedules.
- Boundary: meters and equipment covered by the bill; other uses that must be separated.
- Existing recovery and any proposed waste-heat source: location, temperature, flow and availability.
Keep unknowns blank. Record the source and date of each value. Steam mass alone does not define useful heat; its state and the return/discharge boundary also matter.
先檢查系統,再考慮設備
The US Department of Energy groups steam guidance around generation, distribution, heat recovery and end use, including insulation, steam traps and condensate return. These are topics for a competent site review, not instructions to change pressure, combustion or safety settings yourself.
Heat recovery or a heat pump may be one direction to assess after the demand and source are understood. This site does not perform a complete boiler or steam-network diagnosis from a bill.
選擇下一步
If the boundary is unclear, mark meters and heat users on a simple sketch and assign the missing measurements. If source and demand information is available, read the economic screening guide. For steam-system references, start with DOE Steam Systems (checked 14 October 2026). This link is a reference, not an endorsement.
依據與使用邊界
This is an editorial learning guide, not a plant audit or a measured savings result. Site inputs remain unknown until supplied and checked. Detailed design, procurement, hygienic and pressure-equipment decisions require qualified review. Read our editorial principles.
现场准备单
蒸汽用量与费用准备单
选定一台设备或一道工序,按项记录。未掌握的数据留空,资料和原理在下方继续阅读。
电子填写需要启用 JavaScript。以下空白单仍可通过浏览器打印,原指南继续保留。
打印空白单
Open Thermal AI · 空白准备单
蒸汽用量与费用准备单
准备单编号: ________________ · 模板版本: 2026-10-18.1
- 工厂/车间
- 设备名称或编号 / 工序名称
- 记录人
- 调查日期
本单用于收集资料。已记录不等于已核实,也不代表项目可行;未知值留空。
已记录不等于已核实。填写完成不代表安全合格、项目可行或节能收益;专业人员仍需复核。
| ST-01 · 圈定本次要看的用汽设备 · ________ | |
|---|---|
| 车间、设备位号、用途、供汽来源 去哪里查;缺失时怎么办: 设备标识和管网图;画简图标明待确认连接 设备编号(位号)通常在现场标签或图纸上。没有编号时先写设备名称和位置,并注明编号待确认,不必编造正式编号。 | |
| 用途 | |
| 供汽来源 | |
| 记录状态 | □ 未查看 □ 已记录 □ 待补测 □ 待确认 □ 不适用(须说明) |
| 资料类型 | |
| 资料编号/来源说明 | |
| 测点/对象位置 | |
| 记录时间或起止周期 | |
| 运行状态(生产/清洗/待机等) | |
| 备注/关联准备单编号 | |
| 待办负责人 | |
| 约定完成日期 | |
| 不适用的原因 | |
| 复核人、日期与意见(由人填写) | |
| ST-02 · 收集账单并标出供汽范围 · ________ | |
|---|---|
| 账期、用量、单位、单价、计价口径、覆盖设备 去哪里查;缺失时怎么办: 财务账单/供汽合同;全厂账单标“未分摊”,不得直接分配给单台设备 计价方式是账单按什么数量收费,例如元/吨蒸汽、元/kWh 电。核对币种、单位、账期、含税情况及固定费用;全厂账单不能未经分摊就用于一台设备。 | |
| 账期 | |
| 账单用量及单位 | |
| 单价及计价口径 | |
| 覆盖哪些设备 | |
| 记录状态 | □ 未查看 □ 已记录 □ 待补测 □ 待确认 □ 不适用(须说明) |
| 资料类型 | |
| 资料编号/来源说明 | |
| 测点/对象位置 | |
| 记录时间或起止周期 | |
| 运行状态(生产/清洗/待机等) | |
| 备注/关联准备单编号 | |
| 待办负责人 | |
| 约定完成日期 | |
| 不适用的原因 | |
| 复核人、日期与意见(由人填写) | |
| ST-03 · 抄录设备入口蒸汽工况 · ________ | |
|---|---|
| 压力及表压/绝压、温度 °C、时间、测点 去哪里查;缺失时怎么办: 现有仪表与运行记录;状态未知交专业人员确认,不推算蒸汽品质 表压以当地大气压力为零点,绝压以真空为零点。先查仪表或文件标注;不知道基准时保留原读数和单位,标记待确认,不自动换算。 | |
| 入口压力及单位 | |
| 压力基准(表压/绝压) | |
| 入口温度 (°C) | |
| 记录状态 | □ 未查看 □ 已记录 □ 待补测 □ 待确认 □ 不适用(须说明) |
| 资料类型 | |
| 资料编号/来源说明 | |
| 测点/对象位置 | |
| 记录时间或起止周期 | |
| 运行状态(生产/清洗/待机等) | |
| 备注/关联准备单编号 | |
| 待办负责人 | |
| 约定完成日期 | |
| 不适用的原因 | |
| 复核人、日期与意见(由人填写) | |
| ST-04 · 查设备的用汽记录 · ________ | |
|---|---|
| 同期累计量 t 或流量 t/h、起止时间、表号 去哪里查;缺失时怎么办: 分表/历史记录;无分表则登记计量缺口,不按额定产汽量代替 | |
| 累计用汽量或流量及单位 | |
| 计量起止时间 | |
| 表号 | |
| 记录状态 | □ 未查看 □ 已记录 □ 待补测 □ 待确认 □ 不适用(须说明) |
| 资料类型 | |
| 资料编号/来源说明 | |
| 测点/对象位置 | |
| 记录时间或起止周期 | |
| 运行状态(生产/清洗/待机等) | |
| 备注/关联准备单编号 | |
| 待办负责人 | |
| 约定完成日期 | |
| 不适用的原因 | |
| 复核人、日期与意见(由人填写) | |
| ST-05 · 记录凝结水去向 · ________ | |
|---|---|
| 返回/排放/他用;已知回水温度 °C、计量量及周期 去哪里查;缺失时怎么办: 流程图、回收记录;未知连接交现场人员确认 | |
| 回水去向 | |
| 回水温度 (°C) | |
| 回水量及计量周期 | |
| 记录状态 | □ 未查看 □ 已记录 □ 待补测 □ 待确认 □ 不适用(须说明) |
| 资料类型 | |
| 资料编号/来源说明 | |
| 测点/对象位置 | |
| 记录时间或起止周期 | |
| 运行状态(生产/清洗/待机等) | |
| 备注/关联准备单编号 | |
| 待办负责人 | |
| 约定完成日期 | |
| 不适用的原因 | |
| 复核人、日期与意见(由人填写) | |
| ST-06 · 对照生产与供汽时段 · ________ | |
|---|---|
| 班次、生产/清洗/停机时段、同期产量 去哪里查;缺失时怎么办: 班报与运行日志;说明所选周期能代表哪些工况 同时运行时间是余热可用、工序又需要热的共同时间。对照两侧运行记录逐段核对;不能直接填全年 8760 小时,也不能只用一侧的开机小时。储热能否弥补错峰须另行核实。 | |
| 生产/清洗/停机时段 | |
| 同期产量及单位 | |
| 代表哪些工况 | |
| 记录状态 | □ 未查看 □ 已记录 □ 待补测 □ 待确认 □ 不适用(须说明) |
| 资料类型 | |
| 资料编号/来源说明 | |
| 测点/对象位置 | |
| 记录时间或起止周期 | |
| 运行状态(生产/清洗/待机等) | |
| 备注/关联准备单编号 | |
| 待办负责人 | |
| 约定完成日期 | |
| 不适用的原因 | |
| 复核人、日期与意见(由人填写) | |
| ST-07 · 查已有维护检查记录 · ________ | |
|---|---|
| 保温、泄漏、疏水器的最近检查日期与未关闭事项 去哪里查;缺失时怎么办: 维护台账;无记录列为专业检查任务,不要求用户触碰热管或调阀 | |
| 最近检查日期 | |
| 未处理事项 | |
| 记录状态 | □ 未查看 □ 已记录 □ 待补测 □ 待确认 □ 不适用(须说明) |
| 资料类型 | |
| 资料编号/来源说明 | |
| 测点/对象位置 | |
| 记录时间或起止周期 | |
| 运行状态(生产/清洗/待机等) | |
| 备注/关联准备单编号 | |
| 待办负责人 | |
| 约定完成日期 | |
| 不适用的原因 | |
| 复核人、日期与意见(由人填写) | |
| ST-08 · 找出可能利用的现有余热 · ________ | |
|---|---|
| 来源位置、介质、已知温度/流量/时段、是否已利用 去哪里查;缺失时怎么办: 现有图纸与数据;没有热源资料可先完成蒸汽现状记录 同时运行时间是余热可用、工序又需要热的共同时间。对照两侧运行记录逐段核对;不能直接填全年 8760 小时,也不能只用一侧的开机小时。储热能否弥补错峰须另行核实。 | |
| 热源位置和介质 | |
| 已知温度/流量及单位 | |
| 可用时段和已有用途 | |
| 记录状态 | □ 未查看 □ 已记录 □ 待补测 □ 待确认 □ 不适用(须说明) |
| 资料类型 | |
| 资料编号/来源说明 | |
| 测点/对象位置 | |
| 记录时间或起止周期 | |
| 运行状态(生产/清洗/待机等) | |
| 备注/关联准备单编号 | |
| 待办负责人 | |
| 约定完成日期 | |
| 不适用的原因 | |
| 复核人、日期与意见(由人填写) | |
先选一个具体用热任务
先选一条生产线、一段清洗热水回路或一个干燥任务,记录它需要什么、由哪套系统供热。全厂燃料账单可能包含多种用途,不能直接证明某个项目的可回收热量或可替代比例。
先准备这几类资料
- 供热方式:自备锅炉还是外购蒸汽;燃料或合同价格、单位和账期。
- 用热任务:具体工序、所需温度,涉及蒸汽时记录状态,以及负荷或消耗记录。
- 运行时间:生产、清洗、停机与季节变化。
- 计量边界:账单覆盖哪些仪表和设备,需要分离哪些其他用途。
- 既有回收与潜在余热:位置、温度、流量和可用时间。
未知项留空,每项数据保留来源和日期。蒸汽吨数本身不能确定可用热量,还需要状态和回流或排放边界。
先检查系统,再考虑设备
美国能源部的蒸汽资料覆盖供汽、输送、回收与使用,包括保温、疏水器和凝结水回收。这些是现场专业核查的方向,不是自行修改压力、燃烧或安全设定的操作指令。
明确需求和热源后,可进一步评估余热回收或热泵。本站不会仅凭一张账单完成锅炉或蒸汽管网诊断。
选择下一步
边界不清楚时,先画简图标出仪表与用热设备,并安排补测。有热源和用热资料后,再读项目经济性初筛指南。蒸汽系统原始资料可从美国能源部 Steam Systems查起(2026-10-14 核查)。来源链接不代表对本站的认可。
依据与使用边界
本文为编辑整理的入门指南,不是现场审计或实测节能成果。现场数据在提供并核对前保持未知。详细设计、采购、卫生与压力设备事项需要合格专业人员复核。参见编辑原则。