Compare industrial cooling, heat pumps and energy recovery with your site.查找工业供冷、热泵和余能利用案例,对照自己的现场条件。
Field references and public sources are labeled separately. These entries are not independently metered delivery records.现场参考与公开资料分别标注;这些条目不是独立计量核实的交付记录。
Two site visits, one practical starting point从两次现场调研开始看
See how ammonia heat pumps connect refrigeration heat to plant hot water. Site observations and reported outcomes remain distinct from independent measurements.看氨热泵如何连接制冷排热与厂区热水。现场所见和业主反馈不等于独立计量。
The JCM registry records operation from December 2014. JQA verified the project’s emissions calculation for February–July 2015.JCM 登记资料记载项目于 2014 年 12 月投运。JQA 核证了 2015 年 2 至 7 月的项目减排计算。
PipeChina reports operation from 19 November 2025 and projects annual generation of 3 GWh.国家管网披露,项目于 2025 年 11 月 19 日投运,预计年发电量 300 万千瓦时。
Key risk主要风险
The 3 GWh figure is a forecast. The cited release gives no full-year metered output. Check uninterrupted gas delivery, outlet temperature and reheating energy.300 万千瓦时是预计年发电量,所引公告未给出完整年度实测。现场须核对连续供气、出口温度和复热耗能。
數據狀態:公開來源摘要——本站未再計量。数据状态:公开来源摘要——本站未再计量。
運行記錄與技術資料运行记录与技术资料
PipeChina reports that its Haimen gas station in Nantong started operating an expander-generator in November 2025.国家管网集团披露,江苏南通海门站的天然气膨胀发电机组于 2025 年 11 月投运。
The DOE case attributes 170 billion Btu per year of energy savings to the 1998 steam-system control revisions.美国能源部将每年 1,700 亿 Btu 的节能量归于 1998 年的全厂蒸汽系统控制调整。
JCM records operation starting in April 2017. The registered project covers both chilled water and compressed air.JCM 登记资料记载项目于 2017 年 4 月投运,登记项目同时覆盖冷冻水与压缩空气。
Monitoring figures come from the project team. The public summary does not detail the COP period or auxiliary loads. The 3,080 t/year in the earlier EECA note is an estimate.
Public reports, papers, or vendor materials — source and assumptions labeled
運行記錄與技術資料运行记录与技术资料
EECA records commissioning in March 2022. A project case study reports post-installation monitoring, including extra electricity use and reduced coal use.
架構
前川氨熱泵,由 Active Refrigeration 安裝。
結果狀態
The project case study reports an average COP of 4.1 after installation, with 6,356 MWh less coal energy and 4,000 MWh more electricity on the reported annual basis.
數據來源
Public reports, papers, or vendor materials — source and assumptions labeled
1,040 RT is maximum cooling capacity. The 118°C value is a unit limit. The Project 68 steam concept does not provide annual operating results for the integrated system.
Public reports, papers, or vendor materials — source and assumptions labeled
運行記錄與技術資料运行记录与技术资料
LG reported the start of heat-pump operation in early July 2026. Project 68 separately describes the site's heat-pump and steam-recompression integration concept.
架構
電驅動無油磁懸浮壓縮熱泵。Project 68 方案另設機械蒸汽再壓縮(MVR)供汽。
結果狀態
The July 2026 supplier announcement reports operation of the hot-water heat-pump system.
數據來源
Public reports, papers, or vendor materials — source and assumptions labeled
The CO₂ figure is an operator disclosure through the supplier. The €6.75 million order covers the wider package. Heat-pump duty, COP and stand-alone payback are undisclosed.
Public reports, papers, or vendor materials — source and assumptions labeled
運行記錄與技術資料运行记录与技术资料
在 Interflour 越南麥芽廠,氨熱泵回收發芽段製冷排熱,用於加熱烘乾空氣。
架構
GEA 氨熱泵與集中製冷系統集成。
結果狀態
GEA 案例引述業主介紹裝置已使用。麥芽廠於 2017 年啓用。
數據來源
Public reports, papers, or vendor materials — source and assumptions labeled
Owner quotes COP 3–5, but the later IEA HPT card still marks COP pending validation. Commissioning operation is not long-term acceptance; carbon savings are estimates.
Public reports, papers, or vendor materials — source and assumptions labeled
運行記錄與技術資料运行记录与技术资料
Belgian sugar-refining installation: the November 2025 IEA HPT card records commissioning operation and subsequent compressor operation at full capacity. Annual benefits remain estimates.
溫升
≈ 63 K
架構
採用 GEA 螺桿壓縮機的閉式正戊烷熱泵,回收蒸汽熱量再製蒸汽。
結果狀態
The November 2025 IEA HPT card reports part-load commissioning followed by full compressor capacity after modifications; heating COP still awaited validation.
數據來源
Public reports, papers, or vendor materials — source and assumptions labeled
Design COP is about 2 at a very large temperature lift; the guaranteed COP itself is not published in the press note. CO₂ totals differ between the two sources.
Public reports, papers, or vendor materials — source and assumptions labeled
運行記錄與技術資料运行记录与技术资料
Public sources (Turboden, 17 Feb 2026; IEA HPT demo card): a large heat pump plus mechanical vapor recompression at a delfort specialty-paper mill, reported at 12 MWth and about 20 t/h of superheated steam. Not independently metered here.
溫升
≈ 133 K
架構
閉式大型熱泵(多級離心,異丁烷)串聯機械蒸汽再壓縮,不是單獨的開式水蒸氣循環
結果狀態
Turboden announced full operation on 17 Feb 2026 and said startup COP was about 10% above the guaranteed value. The IEA card records about 2,000 test hours from July to October 2025. Vendor wording calls it the largest steam-producing heat pump built; this site does not audit that ranking.
數據來源
Public reports, papers, or vendor materials — source and assumptions labeled
Public reports, papers, or vendor materials — source and assumptions labeled
運行記錄與技術資料运行记录与技术资料
Public sources (SPH and the NEFI AHEAD demo card): at Takeda's Vienna pharmaceutical site, a butane heat pump and a Spilling steam compressor are reported to deliver about 2.5 t/h at 11 bar(a) / 184°C. Commissioning is given as September 2025. Not independently metered here.
The plant opened in September 2025. AIT confirmed monitoring had started in November 2025. Project 68’s October 2026 webinar summary describes the cascade and 184°C steam. Completed 4,000-hour results and seasonal system COP remain unpublished in the sources reviewed.
數據來源
Public reports, papers, or vendor materials — source and assumptions labeled
Public reports, papers, or vendor materials — source and assumptions labeled
運行記錄與技術資料运行记录与技术资料
Skyven reported sustained COP 8.0 at its 1 MWth Texas steam-heat-pump demonstration center on 2 September 2026, up from 6.5 at commissioning. This is a supplier disclosure; the announcement does not give the demo temperature pair or measurement boundary.
架構
Arcturus 水工質蒸汽熱泵;廠商產品說明爲真空閃蒸後多級蒸汽壓縮
結果狀態
The September 2026 announcement replaces the earlier roadmap with a supplier-reported result of 8.0. The numeric COP field remains blank because comparable test conditions are missing.
數據來源
Public reports, papers, or vendor materials — source and assumptions labeled
Public reports, papers, or vendor materials — source and assumptions labeled
運行記錄與技術資料运行记录与技术资料
Dongfang Electric (3 Feb 2026 start-up): Dongfang Electric reports an 890 kW steam heat pump and booster at the Taiji Fuling pharmaceutical plant in Chongqing, China, lifting about 40°C waste heat to 165°C saturated steam at a stated COP of 2.7. Not independently metered here.
溫升
≈ 125 K
架構
高溫蒸汽熱泵加增壓機;報道電功率約 330 kW,額定製熱 890 kW
結果狀態
Dongfang Electric’s own 3 February 2026 announcement confirms commissioning at Taiji Fuling and reports about 330 kW electrical input, 890 kW rated heat and measured COP 2.7. This is a supplier report, not this site’s independent audit.
數據來源
Public reports, papers, or vendor materials — source and assumptions labeled
COP 2.5 is a supplier-reported FAT value. The card’s 5,000 h/year is not evidence of cumulative site runtime. Do not merge the 650 kW dryer module with PMI’s separate Crespellano heat-pump/electric-boiler program or apply owner savings percentages to the whole Bologna operation.
Public reports, papers, or vendor materials — source and assumptions labeled
運行記錄與技術資料运行记录与技术资料
SPH / JOA demo card (installation year 2025): at Philip Morris Manufacturing & Technology Bologna, a two-stage heat pump turns dryer exhaust heat into saturated steam at 139°C and 2.5 bar(g). Rated duty is 650 kW. A FAT COP of 2.5 is source-reported, not remeasured here.
溫升
≈ 40 K
架構
兩級往復式熱泵(SPH),由 JOA 與乾燥機溼排風直接熱回收集成
結果狀態
The card lists installation year 2025, about 5,000 h/a, and a COP of 2.5 measured during factory acceptance testing. That FAT figure is not a published multi-season site audit.
數據來源
Public reports, papers, or vendor materials — source and assumptions labeled
The April 2026 full-load account and a manufacturer retrospective of a February 2025 test give different dates and COPs. Their equipment/configuration relationship is not established here. Neither a short test nor a heat-pump COP proves annual storage-cycle performance.
Public reports, papers, or vendor materials — source and assumptions labeled
運行記錄與技術資料运行记录与技术资料
Lüchu Technology (9 Apr 2026): a 2 MW-class very-high-temperature heat-pump storage demo at Xisai Science Valley, Huzhou, Zhejiang, China, reached full load. It uses air as the heat-pump fluid and molten salt as storage, and is reported to release superheated steam near 540°C at a COP of 1.41 from about 45°C waste heat. Not a process-steam heat pump, and not independently metered here.
溫升
≈ 495 K
架構
空氣熱泵給熔鹽充熱,再釋放高溫蒸汽——熱泵儲能,不是閉式產汽再串機械蒸汽再壓縮
結果狀態
The builders reported full-load operation on 9 Apr 2026. Electric input is about 1.5 MW and heating output about 2 MW. COP 1.41 is source-reported for the 45°C source. A separate 8 MW / 400°C phase was announced earlier and is not treated here as this operating unit.
數據來源
Public reports, papers, or vendor materials — source and assumptions labeled
Public reports, papers, or vendor materials — source and assumptions labeled
運行記錄與技術資料运行记录与技术资料
Shanghai Electric (acceptance 9 May 2025): a 1.1 MW / 10.8 MWh molten-salt store coupled to a high-temperature heat pump, supplying industrial steam at a factory in Fengxian, Shanghai. This is thermal storage plus a heat pump, not a process-steam heat pump of the closed-cycle plus MVR type. Not independently metered here.
架構
單罐熔鹽儲熱耦合高溫熱泵,用於綠色供汽
結果狀態
Shanghai Electric reported that after more than two months of trial operation the system passed the owner's acceptance on 9 May 2025 and entered commercial operation. Steam conditions are not published as one fixed pair.
數據來源
Public reports, papers, or vendor materials — source and assumptions labeled
Under construction. Capacity, up to 500,000 tonnes/year of steam and up to 100,000 tonnes/year of avoided CO₂ are project targets. The team quotes a design COP of up to 3.4. Operating COP and annual outcomes are unconfirmed.
Public reports, papers, or vendor materials — source and assumptions labeled
運行記錄與技術資料运行记录与技术资料
Public project note: BASF has started construction at Ludwigshafen, Germany, of an open heat-pump system (GKT CompriVAP, formerly GIG Karasek) meant to turn steam-cracker waste heat into up to 50 MW of process steam. Commissioning is scheduled for mid-2027. This entry is under construction, not an operating case.
GKT reported on 3 September 2026 that the first compressors had been positioned and the evaporator stage, vessels, pumps and heat exchangers installed. Piping and electrical work continued. BASF’s commissioning target remains mid-2027.
數據來源
Public reports, papers, or vendor materials — source and assumptions labeled
Public reports, papers, or vendor materials — source and assumptions labeled
運行記錄與技術資料运行记录与技术资料
Vicinity’s May 2026 update keeps its 35 MW Charles River heat-pump complex at Kendall on a 2028 installation target. The stated role is to preheat water for an electric boiler supplying district steam. It remains an engineering/construction project, not an operating heat-pump case.
架構
River-source heat recovery to preheat water for the district-steam electric boiler, per the May 2026 owner account
結果狀態
The 11 May 2026 owner update says heat-pump engineering is active and installation is planned by 2028. Kendall’s electric boiler entered service in November 2024; its eSteam supply is not evidence that the heat pump is operating.
數據來源
Public reports, papers, or vendor materials — source and assumptions labeled
Anonymized engineering notes — field observations and reported outcomes, not independent metering
運行記錄與技術資料运行记录与技术资料
Author field survey (2024-05): same ammonia HP architecture as plant A at a second Central China meat site; plant-reported ~200–300 m³/day hot water and ~¥100k/month steam savings, plus liquid-path and cleanliness lessons.
溫升
≈ 15 K
架構
氨中溫熱泵;下液宜進輔助貯液器(冬季油冷供液),不宜僅接主貯液器
結果狀態
May 2024 survey record: Overall operation reported as good; plant continues to displace purchased steam for hot water
數據來源
Anonymized engineering notes — field observations and reported outcomes, not independent metering