South Korea · Ajin P&P Daegu: 108°C hot water for paper drying
LG reported the start of heat-pump operation in early July 2026. Project 68 separately describes the site's heat-pump and steam-recompression integration concept.
Run detailed calculation with this case一键代入详细计算
Engineering data
- Case type
- Public-source case — figures from published reports, papers, or vendor materials
- Data status
- Public-source case
- Data source
- LG Electronics, 8 Jul 2026: https://www.lge.co.kr/story/newsroom/236116 — IEA HPT Project 68 Task 2 integration concept: https://heatpumpingtechnologies.org/content/uploads/sites/81/2026/09/pulppaperintegrationconceptkorea-1.pdf
- Reviewer / date
- Editorial (Open Thermal AI) · 2026-11-21
- Industry
- Pulp & paper
- Source temperature
- Not disclosed
- Sink temperature
- Not disclosed
- Temperature lift
- Not applicable
- Heating or cooling duty
- Not disclosed
- Architecture
- Electric heat pump with oil-free magnetic-bearing compression. The Project 68 concept adds mechanical vapour recompression (MVR) for steam supply.
- Result status
- The July 2026 supplier announcement reports operation of the hot-water heat-pump system.
- Key risk
- 1,040 RT is maximum cooling capacity. The 118°C value is a unit limit. The Project 68 steam concept does not provide annual operating results for the integrated system.
- Existing system
- Paper drying uses a steam network.
- Refrigerant
- R1233zd(E) (LG heat-pump stage)
- COP
- Not disclosed
- Annual energy / emissions savings
- Not disclosed in the sources reviewed.
- Estimated payback
- Not disclosed in the sources reviewed.
Project background
The Daegu paper-mill installation is part of a South Korean industrial R&D programme.
Narrative inputs
Confirm recoverable exhaust heat at each paper grade, the hot-water temperatures, and steam demand and pressure at the header.
Heat pump solution
Use the heat-pump hot-water stage and the proposed steam stage as separate equipment boundaries when comparing bids.
COP & savings
The reviewed primary sources provide unit specifications and a process concept. Annual heat delivery, total electrical input and integrated COP remain unconfirmed.
Investment / ROI notes
A stand-alone heat-pump payback is not established here. Use your site's metered loads, utility prices, integration cost and backup duty for a separate estimate.