← All cases

Public-source case — figures from published reports, papers, or vendor materials

Australia · Hardwick Meatworks: 1 MW heat pump and oil heat recovery

The ARENA-funded final report separates heat-pump output, direct oil heat recovery and gas top-up across two production periods.

Run detailed calculation with this case

Engineering data

Case type
Public-source case — figures from published reports, papers, or vendor materials
Data status
Public-source case
Reviewer / date
Editorial (Open Thermal AI) · 2026-11-21
Industry
Food
Source temperature
Not disclosed
Sink temperature
Not disclosed
Temperature lift
Not applicable
Heating or cooling duty
1000 kW
Architecture
Ammonia heat pump connected to the existing refrigeration system, direct oil heat recovery and hot-water storage.
Result status
For October 2023–September 2024, the final report assigns 45% of hot-water energy to the heat pump and 16% to oil heat recovery.
Key risk
The often quoted 61% combines both recovery routes. It refers to hot-water energy for the reported period. Gas still provides final top-up to 85°C.
Existing system
Gas water heaters supply final process water. The plant already uses ammonia refrigeration.
Refrigerant
R717
COP
Not disclosed
Annual energy / emissions savings
Not disclosed in the sources reviewed.
Estimated payback
Not disclosed in the sources reviewed.

Project background

The Kyneton, Victoria demonstration combined a heat pump with an electrical-supply upgrade. The public installation is the source reference for the separate on-site teaching example.

Narrative inputs

Report figures: 1 MW heat-pump rating. Combined logged thermal output was reported at 1,266 kW for October 2023–September 2024 and 1,088 kW for October 2024–May 2025.

Heat pump solution

Route recovered heat to hot-water storage and retain the gas heaters for the final rise to the process temperature.

COP & savings

The report gives 5,059 logged hours (5,512 annualised) for October 2023–September 2024 and 2,461 logged hours (4,277 annualised) for October 2024–May 2025. The latter period had lower production.

Investment / ROI notes

A stand-alone heat-pump payback is not established here. Use your site's metered loads, utility prices, integration cost and backup duty for a separate estimate.