← All cases

Public-source case — figures from published reports, papers, or vendor materials

UK · IRD Newcastle: gas-engine-driven steam heat pump demonstrator

A 1983 demonstration tested a gas-engine-driven heat pump with engine heat recovery for low-pressure process steam.

Run detailed calculation with this case

Engineering data

Case type
Public-source case — figures from published reports, papers, or vendor materials
Data status
Public-source case
Data source
European Commission CORDIS demonstration record: https://cordis.europa.eu/project/id/EE.-00146-81 — IRD prototype final report summary, EUR 6262: https://aei.pitt.edu/35354/1/A1711.pdf
Reviewer / date
Editorial (Open Thermal AI) · 2026-11-21
Industry
Chemical
Source temperature
Not disclosed
Sink temperature
Not disclosed
Temperature lift
Not applicable
Heating or cooling duty
Not disclosed
Architecture
A reciprocating gas engine drives the reciprocating refrigerant compressor. Heat from the engine and its exhaust is recovered for steam duty.
Result status
The EU project summary reports 2,000 trial hours, with peak heat output of 325 kW at 216 kW fuel input and a primary-energy ratio of 1.51.
Key risk
The trial took place at IRD, and the 110°C and 600 kg/h figures describe the design. The reported ratio 1.51 uses fuel input and differs in scope from an electric heating COP.
Existing system
The project targeted chemical-industry steam duty. The unit was installed at IRD and tested under conditions similar to those of the intended industrial process.
Refrigerant
R-114
COP
Not disclosed
Annual energy / emissions savings
Not established in the sources reviewed.
Estimated payback
Not established in the sources reviewed.

Project background

The European Commission project archive records commissioning at IRD in January 1983. An earlier plan proposed using exhaust heat at a chemical plant.

Narrative inputs

For a new application, check required steam pressure and flow, water quality, coincident waste heat and steam demand, and the fuel heating-value basis.

Heat pump solution

Use the gas engine’s shaft output to run the compressor. Steam generation uses condenser heat and recovered engine heat.

COP & savings

Treat 325 kW and 216 kW as reported trial-point figures. The 2,000 hours are accumulated trials. Annual performance would require fuel, auxiliary power and delivered steam logs.

Investment / ROI notes

CORDIS reports a historical estimate of 3.6–4.9 years. A new estimate needs current prices, installed cost, maintenance and backup steam.