← All cases

Public-source case — figures from published reports, papers, or vendor materials

Vicinity Kendall, Cambridge: 35 MW river-source heat pump for district steam, installation targeted by 2028

Vicinity’s May 2026 update keeps its 35 MW Charles River heat-pump complex at Kendall on a 2028 installation target. The stated role is to preheat water for an electric boiler supplying district steam. It remains an engineering/construction project, not an operating heat-pump case.

Run detailed calculation with this case

Engineering data

Case type
Public-source case — figures from published reports, papers, or vendor materials
Data status
Public-source case
Reviewer / date
Editorial (Open Thermal AI) · 2026-11-02
Industry
District heating
Source temperature
Not disclosed
Sink temperature
Not disclosed
Temperature lift
Not applicable
Heating or cooling duty
35000 kW
Architecture
River-source heat recovery to preheat water for the district-steam electric boiler, per the May 2026 owner account
Result status
The 11 May 2026 owner update says heat-pump engineering is active and installation is planned by 2028. Kendall’s electric boiler entered service in November 2024; its eSteam supply is not evidence that the heat pump is operating.
Key risk
35 MW is planned capacity. The 2026 description gives a preheating role; it does not establish direct steam output or a measured heat-pump COP. The operating electric boiler and future heat pump must be distinguished.
Existing system
Existing Kendall district-steam plant; a natural-gas boiler is being removed to make room for the heat pump
Refrigerant
Not stated in the construction note used here
COP
Not disclosed
Annual energy / emissions savings
Not stated as a measured total; the plant is not operating
Estimated payback
Not disclosed

Project background

Vicinity Energy, DCO Energy, and Everllence announced an industrial heat-pump complex for the Kendall Square district-energy plant in Cambridge, Massachusetts. The library files it under district heating and under construction. It is steam, but the customer is a city steam network.

Narrative inputs

Planned heat-pump scale: 35 MW. The May 2026 account describes river-source preheating for an electric boiler; heat-pump temperatures, steam duty, COP and annual hours are not established.

Heat pump solution

The owner describes extracting Charles River heat and using it to preheat electric-boiler water. Published materials describe an integrated district-steam scheme; the final heat-pump/boiler boundary must be checked before comparing it with direct process-steam heat pumps.

COP & savings

There is no operating COP. The only scale figure is the announced 35 MW. A separate company remark about progress elsewhere is not copied here as performance of Kendall.

Investment / ROI notes

No investment or payback is in the construction note used here.

FAQ

Is this a verified measured project?

No. Evidence level is public-source, and installation is still a 2028 target. There is no measurement record.

Why is the industry district heating?

The heat pump feeds Vicinity's district steam network in Cambridge and Boston, not a single factory process. The steam-heat-pump tag is still applied, together with under construction.