Vicinity Kendall, Cambridge: 35 MW river-source heat pump for district steam, installation targeted by 2028
Vicinity’s May 2026 update keeps its 35 MW Charles River heat-pump complex at Kendall on a 2028 installation target. The stated role is to preheat water for an electric boiler supplying district steam. It remains an engineering/construction project, not an operating heat-pump case.
Run detailed calculation with this case一键代入详细计算
Engineering data
- Case type
- Public-source case — figures from published reports, papers, or vendor materials
- Data status
- Public-source case
- Data source
- Vicinity Energy / Business Wire, 4 Nov 2025: https://www.businesswire.com/news/home/20251104250895/en/Vicinity-Energy-Commences-Construction-of-Industrial-Scale-Heat-Pump-Complex-in-Partnership-with-DCO-Energy-and-Everllence — Vicinity, 11 May 2026: https://www.vicinityenergy.us/blog/earth-day-2026-vicinity-energys-climate-progress/
- Reviewer / date
- Editorial (Open Thermal AI) · 2026-11-02
- Industry
- District heating
- Source temperature
- Not disclosed
- Sink temperature
- Not disclosed
- Temperature lift
- Not applicable
- Heating or cooling duty
- 35000 kW
- Architecture
- River-source heat recovery to preheat water for the district-steam electric boiler, per the May 2026 owner account
- Result status
- The 11 May 2026 owner update says heat-pump engineering is active and installation is planned by 2028. Kendall’s electric boiler entered service in November 2024; its eSteam supply is not evidence that the heat pump is operating.
- Key risk
- 35 MW is planned capacity. The 2026 description gives a preheating role; it does not establish direct steam output or a measured heat-pump COP. The operating electric boiler and future heat pump must be distinguished.
- Existing system
- Existing Kendall district-steam plant; a natural-gas boiler is being removed to make room for the heat pump
- Refrigerant
- Not stated in the construction note used here
- COP
- Not disclosed
- Annual energy / emissions savings
- Not stated as a measured total; the plant is not operating
- Estimated payback
- Not disclosed
Project background
Vicinity Energy, DCO Energy, and Everllence announced an industrial heat-pump complex for the Kendall Square district-energy plant in Cambridge, Massachusetts. The library files it under district heating and under construction. It is steam, but the customer is a city steam network.
Narrative inputs
Planned heat-pump scale: 35 MW. The May 2026 account describes river-source preheating for an electric boiler; heat-pump temperatures, steam duty, COP and annual hours are not established.
Heat pump solution
The owner describes extracting Charles River heat and using it to preheat electric-boiler water. Published materials describe an integrated district-steam scheme; the final heat-pump/boiler boundary must be checked before comparing it with direct process-steam heat pumps.
COP & savings
There is no operating COP. The only scale figure is the announced 35 MW. A separate company remark about progress elsewhere is not copied here as performance of Kendall.
Investment / ROI notes
No investment or payback is in the construction note used here.
FAQ
Is this a verified measured project?
No. Evidence level is public-source, and installation is still a 2028 target. There is no measurement record.
Why is the industry district heating?
The heat pump feeds Vicinity's district steam network in Cambridge and Boston, not a single factory process. The steam-heat-pump tag is still applied, together with under construction.