工業供冷

冷量夠不夠?製冷用電和冷凝排熱還有哪些改善機會?

Where to start

Start with the cooling service your plant has to deliver. For a cold store, check room or product temperature, load changes and defrost periods. For process cooling, start with the required supply and return conditions and the production schedule.

What to collect on site

Protect the required cooling duty, approved refrigerant system operating limits and food safety before assessing available heat.

Industrial cooling cases worldwide

Choose a case with a similar cooling duty. Check what the published result covers before comparing it with your site.

Browse all industrial cooling cases

Worked example: cold storage and wash water

Consider a food plant with a cold store and a hot-water cleaning shift. Record cooling, heat rejection and hot-water demand on the same timeline. Check direct heat exchange first, then consider a heat pump if the delivered temperature is too low. If the shifts do not overlap, assess storage separately.

Compare options at the same cooling and hot-water delivery conditions. Include additional refrigeration power and auxiliaries, and count the heat recovered from the same stream only once.

Related public reference: GEA reports that Aurivo Killygordon recovers heat from refrigeration to heat water for milk pasteurization. That site uses heat for pasteurization. The cold-store and wash-water scenario above is illustrative.

Next step

Use the guide to review the cooling baseline and collect data. The project workspace can keep the cooling-to-heating boundaries together and assess the existing heat-recovery routes. The Aurivo reference opens a new draft with reference values to review.

View this topic in the library