食品廠製冷餘熱回收

覈對製冷排熱能否預熱清洗或工藝用水,再決定現場測什麼、先試算哪條路線。

Start with the existing cooling and hot water duties

Consider a food plant with a cold store and a hot-water cleaning shift. Check the required product temperature, sanitation schedule and hot-water delivery conditions. Record what the existing meters cover before comparing a retrofit with the baseline.

Keep cooling capacity, product safety and hygienic isolation within the plant’s approved limits. Have proposed refrigerant or process changes reviewed by qualified staff.

Site data sheet

Log heat rejection and water demand on the same timeline, including peaks and non-overlapping shifts. Record the value, unit, source and measurement period. Mark entries as measured, supplied by the plant, assumed or still to measure.

項目 What to check Notes / source
Site and log intervalProcess, dates, shift, time zone and logging interval. Include cleaning, defrost and downtime. 
Required coolingRoom or product temperature (°C), peak load (kW) and baseline electricity (kWh). List the equipment covered by the meter. 
Recoverable heat streamMedium, measurement point, inlet and outlet temperature (°C), flow (m³/h or kg/s), and permitted outlet or operating limits. 
Wash or process waterPurpose, incoming and required delivery temperature (°C), volume per shift (m³) or flow (m³/h), and times of use. 
Existing energy and costsElectricity or fuel with units and billing period. Record tariffs, currency and date, including demand charges where relevant. 
Emissions factors, if comparedRecord local electricity and fuel factors, with region, year, unit and source. 
Safety checks and follow-upHygienic isolation, approved refrigeration limits, backup capacity and outage window. List missing measurements, owners and dates. 

Field preparation only. Keep unknown values open and have site safety and process requirements reviewed before selecting equipment. Open Thermal AI · https://www.openthermalai.com/en/topics/food-plant-heat-recovery.html

Download the field checklist (TXT)

Decide which options to screen

直接換熱

Check how much water can be preheated at the available temperatures and flows. Confirm hygienic separation and the required temperature difference.

Heat pump with backup

If direct recovery cannot reach the required temperature, check the heat pump’s operating range, electrical capacity and backup heat for peaks or outages.

Thermal storage

If cooling and water use occur in different shifts, measure both profiles before sizing storage. Check usable storage temperature, heat loss and cleaning requirements.

Compare against the existing system at equal cooling and hot-water delivery. Include changes in refrigeration power, auxiliary loads, backup heat and storage losses. Count each recovered heat stream once.

Public reference: Aurivo dairy, Ireland

GEA reports that the Killygordon plant recovered refrigeration heat with a heat pump to supply hot water for milk pasteurization. The project also replaced refrigeration and processing equipment. The supplier’s reported overall upgrade results cover that broader scope.

The reference draft is saved separately from your own project. It carries source values and assumptions for review. Use your site’s temperatures, flow and schedules for a project decision.

Enter your data and plan verification

In Detailed calculation, choose the refrigeration-to-hot-water route for an applicable heat-pump scenario and review the source and demand conditions. Use the field sheet to prepare direct-exchange and storage reviews where site-specific checks are needed.

Keep missing data and assumptions with the estimate. Compare running costs and emissions within the stated boundary. After commissioning, verify delivered cooling and heat and energy inputs over a representative period.