直接換熱直接换热
Check how much water can be preheated at the available temperatures and flows. Confirm hygienic separation and the required temperature difference.用实测温度和流量核对可预热多少水,确认卫生隔离和换热所需温差。即使只能预热,也可交由原系统补足。
覈對製冷排熱能否預熱清洗或工藝用水,再決定現場測什麼、先試算哪條路線。核对制冷排热能否预热清洗或工艺用水,再决定现场测什么、先试算哪条路线。
Consider a food plant with a cold store and a hot-water cleaning shift. Check the required product temperature, sanitation schedule and hot-water delivery conditions. Record what the existing meters cover before comparing a retrofit with the baseline.以同时有冷库和热水清洗班次的食品厂为例,先核对品温、清洗时段和热水交付要求,再确认现有仪表覆盖哪些设备,用于建立改造前的基线。
Keep cooling capacity, product safety and hygienic isolation within the plant’s approved limits. Have proposed refrigerant or process changes reviewed by qualified staff.维持工厂批准的制冷能力、食品安全与卫生隔离要求。涉及工质系统或工艺的改造须由合格专业人员复核。
Log heat rejection and water demand on the same timeline, including peaks and non-overlapping shifts. Record the value, unit, source and measurement period. Mark entries as measured, supplied by the plant, assumed or still to measure.在同一时间轴记录排热和用水需求,覆盖峰值与错开的班次。写明数值、单位、来源和计量时段,并标注实测、厂方提供、假设或待测。
| 項目记录项目 | What to check要核对的资料 | Notes / source记录与来源 |
|---|---|---|
| Site and log interval现场和记录时段 | Process, dates, shift, time zone and logging interval. Include cleaning, defrost and downtime.工序、日期、班次、时区和记录间隔。覆盖清洗、除霜和停机。 | |
| Required cooling原有制冷任务 | Room or product temperature (°C), peak load (kW) and baseline electricity (kWh). List the equipment covered by the meter.库温或品温(°C)、峰值冷负荷(kW)、原制冷电耗(kWh),注明计量覆盖的设备。 | |
| Recoverable heat stream可回收热源 | Medium, measurement point, inlet and outlet temperature (°C), flow (m³/h or kg/s), and permitted outlet or operating limits.介质、测点、进出口温度(°C)、流量(m³/h 或 kg/s)、允许的出口条件或运行限制。 | |
| Wash or process water清洗或工艺用水 | Purpose, incoming and required delivery temperature (°C), volume per shift (m³) or flow (m³/h), and times of use.用途、进水和交付温度(°C)、班次用量(m³)或流量(m³/h)、用水时段。 | |
| Existing energy and costs现有能耗和费用 | Electricity or fuel with units and billing period. Record tariffs, currency and date, including demand charges where relevant.原系统电耗或燃料用量、单位和账期。记录价格、币种及日期,适用时注明需量费用。 | |
| Emissions factors, if compared对比排放所用因子 | Record local electricity and fuel factors, with region, year, unit and source.记录当地电力和燃料的排放因子,并注明地区、年份、单位及来源。 | |
| Safety checks and follow-up安全核对与补测 | Hygienic isolation, approved refrigeration limits, backup capacity and outage window. List missing measurements, owners and dates.卫生隔离、制冷安全边界、备用能力及停机窗口。列出待测项、负责人和日期。 |
Field preparation only. Keep unknown values open and have site safety and process requirements reviewed before selecting equipment.供现场准备使用。缺项保留待测,选型前由专业人员复核现场安全和工艺条件。 Open Thermal AI · https://www.openthermalai.com/en/topics/food-plant-heat-recovery.html开热智 · https://www.openthermalai.com/zh-CN/topics/food-plant-heat-recovery.html
Compare against the existing system at equal cooling and hot-water delivery. Include changes in refrigeration power, auxiliary loads, backup heat and storage losses. Count each recovered heat stream once.按同样的供冷与热水交付条件和现有系统比较,计入制冷侧用电变化、辅机、备用供热和储热损失。同一股余热只计一次。
GEA reports that the Killygordon plant recovered refrigeration heat with a heat pump to supply hot water for milk pasteurization. The project also replaced refrigeration and processing equipment. The supplier’s reported overall upgrade results cover that broader scope.GEA 披露,Killygordon 工厂用热泵回收制冷排热,加热巴氏杀菌用水。项目同时更新了制冷和加工设备,供应商披露的整体改造效果覆盖这一较大的范围。
The reference draft is saved separately from your own project. It carries source values and assumptions for review. Use your site’s temperatures, flow and schedules for a project decision.参照草稿与个人项目分别保存,载入公开参照值和待核对的假设。判断自己的项目时,请使用本厂的温度、流量和运行时段。
In Detailed calculation, choose the refrigeration-to-hot-water route for an applicable heat-pump scenario and review the source and demand conditions. Use the field sheet to prepare direct-exchange and storage reviews where site-specific checks are needed.评估适用的热泵方案时,在详细计算中选择「制冷系统 → 热泵 → 热水/工艺水」,逐项核对热源和用热条件。直接换热和储热的专项核对可先用取数表准备。
Keep missing data and assumptions with the estimate. Compare running costs and emissions within the stated boundary. After commissioning, verify delivered cooling and heat and energy inputs over a representative period.把缺项与假设和试算结果一起保留,按注明的边界比较运行费用和排放。投运后,在有代表性的计量期间核对实际供冷、供热和能源输入。