New Zealand · ANZCO Canterbury: 1 MW ammonia heat pump for process hot water

EECA records commissioning in March 2022. A project case study reports post-installation monitoring, including extra electricity use and reduced coal use.

Run detailed calculation with this case

Engineering data

Case type
Public-source case — figures from published reports, papers, or vendor materials
Data status
Public-source case
Reviewer / date
Editorial (Open Thermal AI) · 2026-11-21
Industry
Food
Source temperature
Not disclosed
Sink temperature
Not disclosed
Temperature lift
Not applicable
Heating or cooling duty
1000 kW
Architecture
Mayekawa ammonia heat pump, installed by Active Refrigeration.
Result status
The project case study reports an average COP of 4.1 after installation, with 6,356 MWh less coal energy and 4,000 MWh more electricity on the reported annual basis.
Key risk
Monitoring figures come from the project team. The public summary does not detail the COP period or auxiliary loads. The 3,080 t/year in the earlier EECA note is an estimate.
Existing system
Two coal boilers supplied steam and indirect hot water. A hot-water ring main and local electric top-up serve process areas.
Refrigerant
R717
COP
Not disclosed
Annual energy / emissions savings
The case study reports 2,356 MWh/year net energy savings and an 8% site emissions reduction (1,750 t CO₂e).
Estimated payback
Not disclosed in the sources reviewed.

Project background

EECA cites the 1 MW installation at Ashburton, New Zealand. The later RACE for 2030 case study describes DETA's post-installation monitoring and verification.

Narrative inputs

Obtain concurrent refrigeration and hot-water load profiles, the ring-main return temperature and each area's top-up requirements.

Heat pump solution

Recover refrigeration heat for the hot-water network while retaining supplementary heating for temperature and load requirements.

COP & savings

The study's 4.1 average COP is retained with its monitoring context. Confirm the meter boundary, ammonia safety arrangements and backup use before applying the results to another site.

Investment / ROI notes

A stand-alone heat-pump payback is not established here. Use your site's metered loads, utility prices, integration cost and backup duty for a separate estimate.