New Zealand · ANZCO Canterbury: 1 MW ammonia heat pump for process hot water
EECA records commissioning in March 2022. A project case study reports post-installation monitoring, including extra electricity use and reduced coal use.
Run detailed calculation with this case一键代入详细计算
Engineering data
- Case type
- Public-source case — figures from published reports, papers, or vendor materials
- Data status
- Public-source case
- Data source
- EECA installation and original estimate: https://www.eeca.govt.nz/insights/eeca-insights/industrial-heat-pumps-for-process-heat/ — RACE for 2030 / DETA, updated case study: https://www.racefor2030.com.au/content/uploads/ANZCO-Foods-Canterbury-heat-pump-case-study-final.pdf
- Reviewer / date
- Editorial (Open Thermal AI) · 2026-11-21
- Industry
- Food
- Source temperature
- Not disclosed
- Sink temperature
- Not disclosed
- Temperature lift
- Not applicable
- Heating or cooling duty
- 1000 kW
- Architecture
- Mayekawa ammonia heat pump, installed by Active Refrigeration.
- Result status
- The project case study reports an average COP of 4.1 after installation, with 6,356 MWh less coal energy and 4,000 MWh more electricity on the reported annual basis.
- Key risk
- Monitoring figures come from the project team. The public summary does not detail the COP period or auxiliary loads. The 3,080 t/year in the earlier EECA note is an estimate.
- Existing system
- Two coal boilers supplied steam and indirect hot water. A hot-water ring main and local electric top-up serve process areas.
- Refrigerant
- R717
- COP
- Not disclosed
- Annual energy / emissions savings
- The case study reports 2,356 MWh/year net energy savings and an 8% site emissions reduction (1,750 t CO₂e).
- Estimated payback
- Not disclosed in the sources reviewed.
Project background
EECA cites the 1 MW installation at Ashburton, New Zealand. The later RACE for 2030 case study describes DETA's post-installation monitoring and verification.
Narrative inputs
Obtain concurrent refrigeration and hot-water load profiles, the ring-main return temperature and each area's top-up requirements.
Heat pump solution
Recover refrigeration heat for the hot-water network while retaining supplementary heating for temperature and load requirements.
COP & savings
The study's 4.1 average COP is retained with its monitoring context. Confirm the meter boundary, ammonia safety arrangements and backup use before applying the results to another site.
Investment / ROI notes
A stand-alone heat-pump payback is not established here. Use your site's metered loads, utility prices, integration cost and backup duty for a separate estimate.