Oil & gas
China · PipeChina Haimen station: natural gas pressure recovery
PipeChina reports that its Haimen gas station in Nantong started operating an expander-generator in November 2025.
Engineering data
- Case type
- Public-source case — figures from published reports, papers, or vendor materials
- Data status
- Public-source case
- Data source
- PipeChina, project operator’s 21 November 2025 release: https://www.pipechina.com.cn/front/news/3003923.html
- Reviewer / date
- Editorial (Open Thermal AI) · 2026-11-24
- Industry
- Oil & gas
- Energy source
- The pressure drop of natural gas during delivery from the transmission network.
- Energy use
- Electricity used on-site, with surplus exported to the grid.
- Architecture
- Expander-generator in parallel with existing pressure regulation. The operator describes natural-ventilation reheating of the gas after expansion.
- Result status
- PipeChina reports operation from 19 November 2025 and projects annual generation of 3 GWh.
- Key risk
- The 3 GWh figure is a forecast. The cited release gives no full-year metered output. Check uninterrupted gas delivery, outlet temperature and reheating energy.
Project background
Haimen is a transmission gas delivery station in Nantong, Jiangsu. PipeChina disclosed commissioning of pressure-recovery generation at the station in November 2025.
Narrative inputs
Record upstream and downstream absolute pressures, gas composition, seasonal flow, minimum delivery temperature and electricity used for reheating or auxiliaries.
Recovery system
Use part of the pressure drop to turn an expander-generator. The original regulator remains in parallel so it can take over supply when the generator is offline.
Performance boundary
Verify annual net electricity with metering of output and auxiliary energy over the same period, together with gas delivery and bypass records.
Investment / ROI notes
The commissioning release gives a generation forecast. Investment and payback remain undisclosed. Check net electricity value, reheating and availability before estimating returns.