Trace the drive and working fluid to identify a unit. For a new project, check direct recovery first, then shortlist routes from site data.

Five routes you can distinguish on site

Classify by the main drive and the path of the refrigerant or process vapor. Hot water and steam describe the output, and air, wastewater and refrigeration reject heat describe the heat source. Several stages can be combined in one plant.

  1. Closed-cycle electric vapor compression. A motor drives a compressor in a separate refrigerant circuit. The heat is delivered through a condenser or gas cooler. Look for the compressor drive and trace the refrigerant loop on the drawing.
  2. Type I absorption heat pump. Higher-temperature heat, such as steam, drives a generator. The machine recovers lower-temperature heat and delivers useful heat at an intermediate level, typically from the absorber and condenser. Identify the driving-heat inlet, low-temperature source and useful-heat outlet.
  3. Type II absorption heat pump (heat transformer). A medium-temperature heat source supplies the generator and evaporator. The absorber delivers part of that heat at a higher temperature, and the condenser rejects heat at a lower temperature. Trace both the high-temperature delivery and the heat rejection circuit.
  4. Open-cycle mechanical vapor recompression (MVR). A mechanical compressor raises the pressure of the process vapor itself, for example secondary vapor from an evaporator, so it can supply heat again. Trace the vapor line through the compressor to the heat user.
  5. Steam-jet thermocompression (TVR). Higher-pressure motive steam entrains low-pressure vapor through a jet thermocompressor. The mixed discharge supplies useful heat at intermediate pressure. Verify the motive, suction and discharge lines and the point of use.

Engine- or turbine-driven compressors, adsorption cycles and combined systems also exist. Record the drive and fluid path for each stage when a single route does not describe the equipment.

Existing equipment: what confirms its type?

  1. Find the equipment tag and model. Match the nameplate to the manufacturer’s manual and the current piping and instrumentation diagram (P&ID). Check the drawing revision against the installed equipment.
  2. Confirm the main drive. Find what supplies the compressor shaft, absorption generator or steam-jet nozzle. Electrical power may run auxiliaries, and a steam line may serve the process or be on the discharge side.
  3. Trace the fluid and where its heat goes. Check where the line starts, where it goes and what flows through it. Confirm whether the compressor handles a separate refrigerant or process vapor. For absorption equipment, trace the driving heat, recovered heat, delivery and rejection to distinguish Type I and Type II. For a steam ejector, check that its discharge provides useful heat rather than only serving a vacuum system.

Record the outcome: confirmed when the documentation and installed connections agree, provisional when some evidence is missing, or unresolved when the evidence conflicts. Note drawing revision, equipment tag and what must be checked next. Use site-approved documents, installed instruments and authorized observations. Leave opening equipment or tapping live lines to qualified personnel under site procedures.

New projects: use field checks to build a shortlist

  1. Set the heat duty and test direct recovery first. Pick one process. Record the required medium, supply and return temperatures or steam state and pressure, load profile, and any hygiene or isolation constraints. For the source, record medium, inlet and minimum allowed outlet conditions, flow and timing. Check whether direct exchange can meet all or part of the duty after allowing for a heat-exchanger approach and simultaneous operation. Screen the remaining duty.
  2. Check for reusable process vapor. If it is available while heat is needed, record the suction and required delivery states, pressures (absolute or gauge), flow range, entrained liquid and contaminants. For evaporators, check boiling-point rise and heat-exchanger approach. Assess MVR if mechanical compression and the vapor path are feasible. Consider TVR as well if affordable motive steam is available at the required pressure and the process can use the mixed discharge. Follow the evaporation and concentration checklist for details.
  3. Check electric capacity and driving heat. With a separate heat source and sufficient electric capacity, check closed-cycle electric compression against the source and sink envelopes, including heat-exchanger approaches and part load. When higher-temperature driving heat and lower-temperature recoverable heat are both available during the duty, assess Type I absorption. When medium-temperature waste heat is available, only part needs a temperature upgrade, and a lower-temperature heat sink can accept the rejected heat, assess Type II absorption. Confirm actual temperatures, usable capacity, operating overlap and what the driving heat would otherwise be used for.
  4. Check integration and compare equivalent service. Compare the same useful heat delivered at the process, including backup and availability. Count electricity, driving heat or motive steam, auxiliaries, any added refrigeration load, and integration and maintenance costs. Check water quality, refrigerant and pressure safety, hygiene and downtime. A nameplate COP or a source temperature by itself cannot settle the choice.

Example: An evaporator has secondary vapor while its heating side needs steam. Record MVR as a candidate pending confirmation of vapor quality and the required pressure rise. Keep TVR pending until the pressure, availability and cost of motive steam are verified.

Write one row per route: candidate and reason · supporting evidence · missing data or constraint · next check. For readings, note the instrument or document, point, units, time and operating condition. Keep measured, documented and assumed values distinct. If a key condition is unknown, leave the route pending. Several routes can proceed to comparison. The shortlist does not establish feasibility or support procurement.

Technical references