← All cases

Public-source case — figures from published reports, papers, or vendor materials

Takeda Vienna AHEAD: heat pump plus steam compressor to 11 bar(a) / 184°C

Public sources (SPH and the NEFI AHEAD demo card): at Takeda's Vienna pharmaceutical site, a butane heat pump and a Spilling steam compressor are reported to deliver about 2.5 t/h at 11 bar(a) / 184°C. Commissioning is given as September 2025. Not independently metered here.

Run detailed calculation with this case

Engineering data

Case type
Public-source case — figures from published reports, papers, or vendor materials
Data status
Public-source case
Reviewer / date
Editorial (Open Thermal AI) · 2026-11-21
Industry
Pharma
Source temperature
70°C
Sink temperature
184°C
Temperature lift
≈ 114 K
Heating or cooling duty
1700 kW
Architecture
SPH steam-generating heat pump to about 115–120°C, then a Spilling steam compressor to 11 bar(a) / 184°C
Result status
The plant opened in September 2025. AIT confirmed monitoring had started in November 2025. Project 68’s October 2026 webinar summary describes the cascade and 184°C steam. Completed 4,000-hour results and seasonal system COP remain unpublished in the sources reviewed.
Key risk
COP 4.4 applies to the steam-generating heat-pump stage around 120°C. The 184°C boundary also needs upstream heat supply and downstream steam compression. The cited 80% is an upper estimate for steam-related emissions.
Existing system
Natural-gas steam for pharmaceutical production and sterilization; waste heat available from site refrigeration / an existing hot-water heat pump
Refrigerant
R717 (upstream heat pump) / R600 (steam-generating heat pump) / R718 (steam compressor)
COP
Not disclosed
Annual energy / emissions savings
The project cites potential reductions of up to about 1,600 t/year CO₂ and up to about 80% of steam-related emissions under its stated conditions. The October 2026 webinar summary repeats the upper percentage without a completed annual metering result.
Estimated payback
Not disclosed in the sources used here

Project background

The AHEAD project (Advanced Heat Pump Demonstrator) is a named installation at Takeda's pharmaceutical campus in Vienna, with AIT and SPH, funded under Austria's NEFI programme. It is a public-source process-steam case, separate from this site's anonymized field surveys.

Narrative inputs

Source: about 70°C hot water. Sink: steam at 11 bar(a) / 184°C, about 2.5 t/h and 1.7 MW thermal as reported for the heat-pump rating. The first stage uses n-butane; the second stage compresses steam.

Heat pump solution

The SPH heat pump turns the hot-water source into steam near 115–120°C (about 1.9 bar(a) in one SPH description). A Spilling steam compressor then raises that steam to about 11 bar(a) and 184°C for pharmaceutical duties.

COP & savings

Reported COP about 4.4 belongs to the heat-pump stage producing steam near 120°C at up to 1.7 MW. The downstream compressor delivers about 2.5 t/h at 184°C. Up to 1,600 tonnes/year of CO₂ savings is a potential benefit. AIT confirms monitoring is underway, without publishing a completed annual performance result in the source reviewed.

Investment / ROI notes

Capital cost and payback are not in the sources used here. Emissions claims stay labeled as project statements.

FAQ

Is this a verified measured project?

No. Evidence level is public-source. See SPH's project note and the NEFI AHEAD demo card (file date 2025-10-08). This site did not meter the Vienna plant.

Why is COP left blank on the card?

The published COP near 4.4 belongs to the heat-pump stage at about 120°C steam. The process steam at 184°C includes a second compression stage, so a single card COP would mix two different boundaries.