Field preparation
Refrigeration heat-recovery preparation
Choose one device or process and record each item. Leave unknowns blank; guidance and sources continue below.
Enable JavaScript for electronic entry. The blank checklist below can still be printed using your browser; the guide remains available.
Print blank sheet
Open Thermal AI · Blank sheet
Refrigeration heat-recovery preparation
Sheet ID: ________________ · Template version: 2026-10-18.1
- Site / workshop
- Equipment tag / process
- Recorded by
- Survey date
The specialist checklist uses ammonia systems. Other refrigerants need their own review. Read existing records; gauge installation, pipe opening, sampling and setting changes require qualified personnel and site procedures.
Recorded does not mean verified. Completion does not establish safety, feasibility or savings; professional review is still needed.
| RF-01 · Confirm the refrigeration system and fluid · ________ | |
|---|---|
| System tag, refrigerant, stages and refrigeration duty. Where to look; what to do if missing: Use drawings, labels and the responsible person; confirm an unknown fluid first. An equipment tag is the identifier on its label or drawing. If unavailable, record the name and location and mark the tag as unconfirmed; do not invent an official identifier. | |
| Refrigerant | |
| Stages and refrigeration duty | |
| Record status | □ Not reviewed □ Recorded □ Needs measurement □ Needs confirmation □ Not applicable (explain) |
| Evidence type | |
| Document ID / source reference | |
| Measurement point / object location | |
| Time or recording period | |
| Operating condition (production/cleaning/idle) | |
| Notes / related sheet ID | |
| Action owner | |
| Target date | |
| Reason not applicable | |
| Reviewer, date and comments (human review) | |
| RF-02 · Read suction and discharge records · ________ | |
|---|---|
| Suction/discharge temperatures, pressures and bases, and load state. Where to look; what to do if missing: Read existing controls and logs; no gauge installation or pipe opening is requested. | |
| Suction temperature (°C) | |
| Discharge temperature (°C) | |
| Suction/discharge pressures, units and bases | |
| Load state | |
| Record status | □ Not reviewed □ Recorded □ Needs measurement □ Needs confirmation □ Not applicable (explain) |
| Evidence type | |
| Document ID / source reference | |
| Measurement point / object location | |
| Time or recording period | |
| Operating condition (production/cleaning/idle) | |
| Notes / related sheet ID | |
| Action owner | |
| Target date | |
| Reason not applicable | |
| Reviewer, date and comments (human review) | |
| RF-03 · Record condensing conditions separately · ________ | |
|---|---|
| Condensing pressure/temperature, rejection method and ambient conditions. Where to look; what to do if missing: Use existing trends; discharge temperature is not a constant heat-source temperature. | |
| Condensing pressure, unit and basis | |
| Condensing temperature (°C) | |
| Rejection method and ambient conditions | |
| Record status | □ Not reviewed □ Recorded □ Needs measurement □ Needs confirmation □ Not applicable (explain) |
| Evidence type | |
| Document ID / source reference | |
| Measurement point / object location | |
| Time or recording period | |
| Operating condition (production/cleaning/idle) | |
| Notes / related sheet ID | |
| Action owner | |
| Target date | |
| Reason not applicable | |
| Reviewer, date and comments (human review) | |
| RF-04 · Check same-period electricity · ________ | |
|---|---|
| Actual compressor power or energy and period, including auxiliary scope. Where to look; what to do if missing: Use meters/controls; rated power is not actual electricity use. | |
| Actual power/energy and unit | |
| Period and auxiliary scope | |
| Record status | □ Not reviewed □ Recorded □ Needs measurement □ Needs confirmation □ Not applicable (explain) |
| Evidence type | |
| Document ID / source reference | |
| Measurement point / object location | |
| Time or recording period | |
| Operating condition (production/cleaning/idle) | |
| Notes / related sheet ID | |
| Action owner | |
| Target date | |
| Reason not applicable | |
| Reviewer, date and comments (human review) | |
| RF-05 · Check the existing recovery loop · ________ | |
|---|---|
| Fluid, inlet/outlet temperatures, actual flow and current use. Where to look; what to do if missing: Use diagrams and trends; distinguish desuperheat from condensation. | |
| Recovery fluid and use | |
| Loop inlet temperature (°C) | |
| Loop outlet temperature (°C) | |
| Actual flow and unit | |
| Record status | □ Not reviewed □ Recorded □ Needs measurement □ Needs confirmation □ Not applicable (explain) |
| Evidence type | |
| Document ID / source reference | |
| Measurement point / object location | |
| Time or recording period | |
| Operating condition (production/cleaning/idle) | |
| Notes / related sheet ID | |
| Action owner | |
| Target date | |
| Reason not applicable | |
| Reviewer, date and comments (human review) | |
| RF-06 · Record simultaneous heat demand · ________ | |
|---|---|
| Purpose, temperatures, flow and overlap with refrigeration. Where to look; what to do if missing: Use the hot-water sheet and the same recording period. Overlap hours are the times when source heat is available and the process needs heat simultaneously. Compare both operating logs. Do not assume 8,760 hours or use only one side’s running hours. Storage for mismatched timing needs separate assessment. | |
| Heat use and related sheet ID | |
| Supply/return temperatures (°C) | |
| Actual flow and unit | |
| Simultaneous operating intervals | |
| Record status | □ Not reviewed □ Recorded □ Needs measurement □ Needs confirmation □ Not applicable (explain) |
| Evidence type | |
| Document ID / source reference | |
| Measurement point / object location | |
| Time or recording period | |
| Operating condition (production/cleaning/idle) | |
| Notes / related sheet ID | |
| Action owner | |
| Target date | |
| Reason not applicable | |
| Reviewer, date and comments (human review) | |
| RF-07 · Review constraints and outstanding actions · ________ | |
|---|---|
| Pressure, oil, water quality and separation issues; responsible reviewer. Where to look; what to do if missing: Use maintenance/safety records; unconfirmed conditions need professional review. | |
| Outstanding issues and constraints | |
| Professional reviewer and document ID | |
| Record status | □ Not reviewed □ Recorded □ Needs measurement □ Needs confirmation □ Not applicable (explain) |
| Evidence type | |
| Document ID / source reference | |
| Measurement point / object location | |
| Time or recording period | |
| Operating condition (production/cleaning/idle) | |
| Notes / related sheet ID | |
| Action owner | |
| Target date | |
| Reason not applicable | |
| Reviewer, date and comments (human review) | |
| RF-08 · Check control priority and seasons · ________ | |
|---|---|
| Refrigeration priority, backup heat and seasonal records. Where to look; what to do if missing: Use process/control documents; do not raise condensing pressure to create apparent savings. | |
| Refrigeration priority and backup heat | |
| Seasonal operation records | |
| Record status | □ Not reviewed □ Recorded □ Needs measurement □ Needs confirmation □ Not applicable (explain) |
| Evidence type | |
| Document ID / source reference | |
| Measurement point / object location | |
| Time or recording period | |
| Operating condition (production/cleaning/idle) | |
| Notes / related sheet ID | |
| Action owner | |
| Target date | |
| Reason not applicable | |
| Reviewer, date and comments (human review) | |
Can ammonia refrigeration heat supply useful hot water?
It can be a candidate when source temperature, available heat and hot-water demand overlap. First separate discharge desuperheating from condensation, then measure temperatures, flow, compressor electricity and demand on a common time base. Compare direct recovery before selecting a booster heat pump.
Protect refrigeration duty and ammonia-system safety. Missing measurements mean more data is needed, not that the project is viable. The checklist below supports screening; it is not a design or operating instruction.
Where the heat exists in an ammonia plant
Compressor discharge is not one constant-temperature source. Split it before treating it as recoverable heat:
- Desuperheat: a smaller share, at a higher temperature.
- Condensation: the larger duty, at a lower temperature.
- Liquid subcooling: a further portion that may remain after condensation.
Refrigeration operation, compressor staging, ambient conditions and product load move the available temperature and duty. Use operating distributions, not one summer design point.
Field measurement checklist
| Boundary | Measure or verify | Why it matters |
|---|---|---|
| Refrigeration | Suction and discharge pressure and temperature; condensing pressure and temperature; each compressor power and load | Available heat, and whether recovery adds power |
| Recovery loop | Inlet and outlet temperature of water or the secondary fluid; calibrated flow; pump power | Useful recovered heat |
| Heat demand | Supply and return temperature; hourly flow; production schedule; hygiene boundary | Demand that is both useful and simultaneous |
| Baseline | Boiler fuel, steam or electric heating over the same period | A saving comparison on the same hours |
| Condition | Oil carried in the discharge; water quality; fouling and corrosion; relief and isolation | Reliability and safety |
Make the data reusable: record the time period, unit, measurement point, operating condition and source for each value. Mark whether it is measured, taken from a bill or drawing, or assumed. Leave unknown values blank and name the next measurement needed; do not treat a case-study value as your site measurement.
Choose the architecture after measuring
After the measurements, test routes in this order:
- Desuperheater preheat: only a limited high-temperature duty. The high-grade share changes with discharge condition.
- Condenser recovery at normal head pressure: more heat, at a lower temperature. Do not raise condensing pressure for recovery unless a whole-system calculation shows a net benefit.
- Booster heat pump: only if the temperature is still short. It needs its own source and sink boundary, auxiliaries and safety boundary, and the low-temperature recovery loop itself must be stable.
Two add-ons, not separate heat sources:
- Secondary loop: add it when product hygiene, water quality or the ammonia charge makes a direct arrangement unsuitable.
- Buffer storage: it can cover a short timing gap. It cannot fix a large seasonal mismatch.
Put these risks in the first-screen register
- Ammonia safety: toxicity, leak detection, ventilation, emergency isolation and site procedures.
- Pressure equipment: classification, relief discharge and the local code that applies.
- Effect on refrigeration: higher head pressure, discharge temperature, oil management and loss of capacity.
- Cross-contamination: barriers for food, potable water or a clean process.
- Water and access: fouling, water treatment, cleanability, and whether maintenance forces an unacceptable shutdown.
- Control priority: which side is protected when refrigeration demand and heat demand move in opposite directions.
- After handover: who owns operation, alarms, maintenance and performance checks.
A practical advance / pause gate
- Advance when representative data shows stable recoverable heat, simultaneous demand, an acceptable temperature route, and a net system saving that does not compromise refrigeration duty or safety.
- Advance with conditions when the route looks plausible, but flow, overlap, the head-pressure effect or integration cost still needs measurement.
- Pause when the case depends on unmeasured waste heat, permanently higher head pressure, an unresolved ammonia safety boundary, or heat demand at a different time from refrigeration.
Missing information? Return to the field preparation sheet, keep unknowns explicit and print pending actions. The sheet does not automatically populate screening inputs.
Have source, demand, timing and price data? Start screening with your own inputs and sources →. You can also compare an anonymized field reference and its limits; its values do not establish your project’s performance.
Safety and engineering boundary
Ammonia systems require qualified refrigeration and pressure-equipment professionals. This checklist is not a hazard analysis, code determination, process-safety review, control sequence or construction design. Do not change setpoints, relief systems, piping or isolation arrangements based on this page.
Evidence and how to use this guide
This is an editorial engineering decision guide, not a measured project outcome. Calculated examples and assumptions are identified in the text. Field references retain their own evidence labels; plant-reported results are not independently verified savings.
For the site evidence, read anonymous plant A and plant B. Use the standards directory to reach primary publications, and confirm their applicability with the responsible engineer. See our editorial and source principles.
现场准备单
制冷余热回收准备单
选定一台设备或一道工序,按项记录。未掌握的数据留空,资料和原理在下方继续阅读。
电子填写需要启用 JavaScript。以下空白单仍可通过浏览器打印,原指南继续保留。
打印空白单
Open Thermal AI · 空白准备单
制冷余热回收准备单
准备单编号: ________________ · 模板版本: 2026-10-18.1
- 工厂/车间
- 设备名称或编号 / 工序名称
- 记录人
- 调查日期
专项清单以氨系统为例。其他制冷剂仅作通用记录,须单独专业核查。只查现有资料;接表、开管、取样或调整设定须由合格人员按现场程序执行。
已记录不等于已核实。填写完成不代表安全合格、项目可行或节能收益;专业人员仍需复核。
| RF-01 · 确认制冷系统与工质 · ________ | |
|---|---|
| 系统位号、制冷剂、级数、设备及原制冷用途 去哪里查;缺失时怎么办: 图纸/铭牌及负责人;工质未知先核实 设备编号(位号)通常在现场标签或图纸上。没有编号时先写设备名称和位置,并注明编号待确认,不必编造正式编号。 | |
| 制冷剂 | |
| 级数和原制冷用途 | |
| 记录状态 | □ 未查看 □ 已记录 □ 待补测 □ 待确认 □ 不适用(须说明) |
| 资料类型 | |
| 资料编号/来源说明 | |
| 测点/对象位置 | |
| 记录时间或起止周期 | |
| 运行状态(生产/清洗/待机等) | |
| 备注/关联准备单编号 | |
| 待办负责人 | |
| 约定完成日期 | |
| 不适用的原因 | |
| 复核人、日期与意见(由人填写) | |
| RF-02 · 查看吸排气运行记录 · ________ | |
|---|---|
| 吸气/排气温度 °C、压力及基准、负荷状态 去哪里查;缺失时怎么办: 已有控制记录;不要求接表或拆管 | |
| 吸气温度 (°C) | |
| 排气温度 (°C) | |
| 吸排气压力及单位/基准 | |
| 负荷状态 | |
| 记录状态 | □ 未查看 □ 已记录 □ 待补测 □ 待确认 □ 不适用(须说明) |
| 资料类型 | |
| 资料编号/来源说明 | |
| 测点/对象位置 | |
| 记录时间或起止周期 | |
| 运行状态(生产/清洗/待机等) | |
| 备注/关联准备单编号 | |
| 待办负责人 | |
| 约定完成日期 | |
| 不适用的原因 | |
| 复核人、日期与意见(由人填写) | |
| RF-03 · 分别记录冷凝状态 · ________ | |
|---|---|
| 冷凝压力/温度、散热方式、日期和环境条件 去哪里查;缺失时怎么办: 现有测点/趋势;不把排气温度当恒定热源温度 | |
| 冷凝压力及单位/基准 | |
| 冷凝温度 (°C) | |
| 散热方式和环境条件 | |
| 记录状态 | □ 未查看 □ 已记录 □ 待补测 □ 待确认 □ 不适用(须说明) |
| 资料类型 | |
| 资料编号/来源说明 | |
| 测点/对象位置 | |
| 记录时间或起止周期 | |
| 运行状态(生产/清洗/待机等) | |
| 备注/关联准备单编号 | |
| 待办负责人 | |
| 约定完成日期 | |
| 不适用的原因 | |
| 复核人、日期与意见(由人填写) | |
| RF-04 · 查看同期耗电 · ________ | |
|---|---|
| 各压缩机实际功率 kW 或电量 kWh 与周期、辅助设备范围 去哪里查;缺失时怎么办: 电表/控制系统;额定功率不当实际用电 | |
| 实际功率或电量及单位 | |
| 对应时间与辅助设备范围 | |
| 记录状态 | □ 未查看 □ 已记录 □ 待补测 □ 待确认 □ 不适用(须说明) |
| 资料类型 | |
| 资料编号/来源说明 | |
| 测点/对象位置 | |
| 记录时间或起止周期 | |
| 运行状态(生产/清洗/待机等) | |
| 备注/关联准备单编号 | |
| 待办负责人 | |
| 约定完成日期 | |
| 不适用的原因 | |
| 复核人、日期与意见(由人填写) | |
| RF-05 · 核对已有回收回路 · ________ | |
|---|---|
| 介质、进出口温度 °C、实际流量、现有用途 去哪里查;缺失时怎么办: 图纸及趋势;区分排气显热与冷凝热 | |
| 回收介质和用途 | |
| 回路入口温度 (°C) | |
| 回路出口温度 (°C) | |
| 实际流量及单位 | |
| 记录状态 | □ 未查看 □ 已记录 □ 待补测 □ 待确认 □ 不适用(须说明) |
| 资料类型 | |
| 资料编号/来源说明 | |
| 测点/对象位置 | |
| 记录时间或起止周期 | |
| 运行状态(生产/清洗/待机等) | |
| 备注/关联准备单编号 | |
| 待办负责人 | |
| 约定完成日期 | |
| 不适用的原因 | |
| 复核人、日期与意见(由人填写) | |
| RF-06 · 记录同时段用热 · ________ | |
|---|---|
| 用途、温度、流量、热源/用热重叠时间 去哪里查;缺失时怎么办: 对应用热准备单;同一数据可关联,不重复录入 同时运行时间是余热可用、工序又需要热的共同时间。对照两侧运行记录逐段核对;不能直接填全年 8760 小时,也不能只用一侧的开机小时。储热能否弥补错峰须另行核实。 | |
| 用热用途及相关准备单编号 | |
| 供回温度 (°C) | |
| 实际流量及单位 | |
| 同时运行时段 | |
| 记录状态 | □ 未查看 □ 已记录 □ 待补测 □ 待确认 □ 不适用(须说明) |
| 资料类型 | |
| 资料编号/来源说明 | |
| 测点/对象位置 | |
| 记录时间或起止周期 | |
| 运行状态(生产/清洗/待机等) | |
| 备注/关联准备单编号 | |
| 待办负责人 | |
| 约定完成日期 | |
| 不适用的原因 | |
| 复核人、日期与意见(由人填写) | |
| RF-07 · 查系统限制和未处理事项 · ________ | |
|---|---|
| 压力/油管理/水质/隔离等现有记录,负责人员 去哪里查;缺失时怎么办: 维护及安全资料;无确认则列专业复核任务 | |
| 未处理事项和限制 | |
| 专业复核人及资料编号 | |
| 记录状态 | □ 未查看 □ 已记录 □ 待补测 □ 待确认 □ 不适用(须说明) |
| 资料类型 | |
| 资料编号/来源说明 | |
| 测点/对象位置 | |
| 记录时间或起止周期 | |
| 运行状态(生产/清洗/待机等) | |
| 备注/关联准备单编号 | |
| 待办负责人 | |
| 约定完成日期 | |
| 不适用的原因 | |
| 复核人、日期与意见(由人填写) | |
| RF-08 · 查控制优先级与季节变化 · ________ | |
|---|---|
| 制冷优先要求、备用供热、季节运行记录 去哪里查;缺失时怎么办: 工艺和控制资料;不提高冷凝压力来获得表面收益 | |
| 制冷优先和备用供热 | |
| 季节运行记录 | |
| 记录状态 | □ 未查看 □ 已记录 □ 待补测 □ 待确认 □ 不适用(须说明) |
| 资料类型 | |
| 资料编号/来源说明 | |
| 测点/对象位置 | |
| 记录时间或起止周期 | |
| 运行状态(生产/清洗/待机等) | |
| 备注/关联准备单编号 | |
| 待办负责人 | |
| 约定完成日期 | |
| 不适用的原因 | |
| 复核人、日期与意见(由人填写) | |
氨制冷余热能否提供有用的热水?
热源温度、可用热量与热水需求在时间上匹配时,可以作为候选方案。先区分排气显热与冷凝热,再按同一时间基准测量温度、流量、压缩机电耗和用热需求。选择升温热泵前,先比较直接回收的可能性。
应保护原有制冷任务并满足氨系统安全要求。缺少测量意味着需要补数据,不意味着项目可行。下列清单用于初筛,不是设计或操作指令。
氨制冷系统的热量在哪里
压缩机排气不是同一个恒温热源。把它当作可回收热量之前,先分开:
- 排气显热:份额较小,温度较高。
- 冷凝负荷:份额较大,温度较低。
- 液体过冷:冷凝之后还可能剩下的一部分热量。
制冷运行、压缩机级数、环境条件和产品负荷都会改变可用温度与热量。用运行分布,不用单一夏季设计点。
现场测量清单
| 边界 | 测量或核对 | 为什么重要 |
|---|---|---|
| 制冷系统 | 吸气与排气的压力、温度;冷凝压力与温度;各台压缩机功率与负荷 | 判断可用热量,以及回收是否增加功耗 |
| 回收回路 | 水或二次介质的进出口温度;校准流量;泵功率 | 测出真正有用的回收热量 |
| 用热需求 | 供回温度;逐时流量;生产计划;卫生边界 | 确认需求既有效又同步 |
| 现有基线 | 同一时段的锅炉燃料、蒸汽或电加热 | 避免用不同时段做节省比较 |
| 设备状态 | 排气带油;水质;结垢与腐蚀;泄压与隔离 | 决定可靠性和安全 |
让数据能够复核:每个数值同时记录时间范围、单位、测点、运行状态和来源;区分实测、账单或图纸记录与假设。未知项保留空白,并注明下一步需要补测什么;不要把案例中的数值当成本项目的现场实测。
测量后再选择架构
测完之后,按这个顺序核对路径:
- 排气显热预热:只适合有限的高温预热。高品位热量比例会随排气状态变化。
- 正常冷凝压力下的冷凝热回收:热量更多,温度更低。除非全系统计算证明有净收益,否则不要为了回收而提高冷凝压力。
- 升温热泵:只有温度仍不够时才评估。它需要单独的热源与热端边界、辅机和安全边界,并且低温回收回路本身要稳定。
下面两项是配套,不是另一路热源:
- 二次回路:产品卫生、水质或氨充注不适合直接布置时再加上。
- 缓冲储热:只能补短时间错配,不能解决明显的季节错配。
初筛风险台账至少应包括这些事项
- 氨安全:毒性、泄漏检测、通风、紧急隔离和现场应急程序。
- 压力设备:分类、泄压排放,以及适用的地方规范。
- 对制冷的影响:冷凝压力升高、排气温度、油管理,以及制冷量下降。
- 交叉污染:食品、生活热水或洁净工艺需要的隔离。
- 水质与检修:结垢、水处理、可清洗性,以及检修会不会造成不可接受的停机。
- 控制优先级:制冷需求与用热需求反向变化时,先保哪一侧。
- 交付后责任:运行、报警、维护和性能验证由谁负责。
实用的继续/暂缓判断
- 建议继续:代表性数据表明可回收热量稳定、用热同步、温度路径可行,而且在不损害制冷任务和安全的前提下仍有全系统净节省。
- 有条件继续:路径看起来合理,但流量、同时运行、冷凝压力影响或集成成本仍需测量。
- 暂缓:方案依赖未测余热、长期抬高冷凝压力、尚未解决的氨安全边界,或用热与制冷明显不在同一时间。
资料还不齐?回到现场准备单,把未知项标为待确认,并打印待办。准备单不会自动填入初筛参数。
已有热源、用热、时段与价格资料?用自己的输入与来源开始初筛 →。也可对照匿名现场参考与适用限制;案例数值不能证明本项目的性能。
安全与工程边界
氨系统必须由具备资格的制冷与压力设备专业人员处理。本清单不是危险分析、法规判定、过程安全审查、控制逻辑或施工设计。不得仅依据本页改变设定值、泄压系统、管路或隔离安排。